Follow
Nima Gerami Seresht
Title
Cited by
Cited by
Year
Computational method for fuzzy arithmetic operations on triangular fuzzy numbers by extension principle
NG Seresht, AR Fayek
International Journal of Approximate Reasoning 106, 172-193, 2019
802019
Dynamic modeling of multifactor construction productivity for equipment-intensive activities
N Gerami Seresht, AR Fayek
Journal of Construction Engineering and Management 144 (9), 04018091, 2018
592018
Queue performance measures in construction simulation models containing subjective uncertainty
N Sadeghi, AR Fayek, NG Seresht
Automation in Construction 60, 1-11, 2015
312015
Neuro-fuzzy system dynamics technique for modeling construction systems
NG Seresht, AR Fayek
Applied Soft Computing 93, 106400, 2020
272020
A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement
N Sadeghi, AR Fayek, N Gerami Seresht
Journal of Construction Engineering and Management 142 (12), 04016071, 2016
262016
A fuzzy clustering algorithm for developing predictive models in construction applications
NG Seresht, R Lourenzutti, AR Fayek
Applied Soft Computing 96, 106679, 2020
252020
Factors influencing multifactor productivity of equipment-intensive activities
N Gerami Seresht, AR Fayek
International Journal of Productivity and Performance Management 69 (9 …, 2019
222019
Overview of fuzzy simulation techniques in construction engineering and management
M Raoufi, NG Seresht, AR Fayek
2016 Annual Conference of the North American Fuzzy Information Processing …, 2016
212016
Framework for risk identification of renewable energy projects using fuzzy case-based reasoning
S Somi, N Gerami Seresht, AR Fayek
Sustainability 12 (13), 5231, 2020
172020
Overview of fuzzy hybrid techniques in construction engineering and management
NG Seresht, R Lourenzutti, A Salah, AR Fayek
Fuzzy hybrid computing in construction engineering and management: Theory …, 2018
162018
Developing a risk breakdown matrix for onshore wind farm projects using fuzzy case-based reasoning
S Somi, NG Seresht, AR Fayek
Journal of Cleaner Production 311, 127572, 2021
152021
A multi criteria decision making model for prioritizing the non-critical activities in construction projects
G Heravi, N Gerami Seresht
KSCE Journal of Civil Engineering 22, 3753-3763, 2018
142018
Consensus building in group decision-making for the risk assessment of wind farm projects
Y Hao, NS Kedir, NG Seresht, W Pedrycz, AR Fayek
2019 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE), 1-7, 2019
132019
Fuzzy simulation techniques in construction engineering and management
M Raoufi, NG Seresht, NB Siraj, AR Fayek
Fuzzy hybrid computing in construction engineering and management: Theory …, 2018
122018
Enhancing resilience in construction against infectious diseases using stochastic multi-agent approach
NG Seresht
Automation in Construction 140, 104315, 2022
102022
Evaluating risk response strategies on construction projects using a fuzzy rule-based system
SH Fateminia, NG Seresht, AR Fayek
36th International Symposium on Automation and Robotics in Construction …, 2019
102019
Application of fuzzy logic integrated with system dynamics in construction modeling
NG Seresht, AR Fayek
82015
Career paths of tradespeople in the construction industry
N Gerami Seresht, AR Fayek
Canadian Journal of Civil Engineering 42 (1), 44-56, 2015
82015
Modeling earthmoving operations in real time using hybrid fuzzy simulation
N Gerami Seresht, AR Fayek
Canadian Journal of Civil Engineering 49 (4), 627-635, 2022
62022
Simulation-based approach for risk assessment in onshore wind farm construction projects
E Mohamed, NG Seresht, S Hague, SM AbouRizk
2020 Asia-Pacific International Symposium on Advanced Reliability and …, 2020
62020
The system can't perform the operation now. Try again later.
Articles 1–20