Follow
hanyu gu
hanyu gu
Verified email at uts.edu.au - Homepage
Title
Cited by
Cited by
Year
Robust and stable scheduling of a single machine with random machine breakdowns
L Liu, H Gu, Y Xi
The International Journal of Advanced Manufacturing Technology 31, 645-654, 2007
1152007
Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck*
Z Yan, G Hanyu, X Yugeng
Journal of Systems Engineering and Electronics 18 (3), 556-565, 2007
372007
A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
D Thiruvady, M Wallace, H Gu, A Schutt
Journal of heuristics 20, 643-676, 2014
232014
Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem
B Wang, Y Xi, H Gu
Computers & operations research 32 (11), 3059-3072, 2005
232005
A Lagrangian relaxation based forward-backward improvement heuristic for maximising the net present value of resource-constrained projects
H Gu, A Schutt, PJ Stuckey
Integration of AI and OR Techniques in Constraint Programming for …, 2013
192013
A rolling window optimization method for large-scale WCDMA base stations planning problem
HY Zhang, YG Xi, HY Gu
European journal of operational research 183 (1), 370-383, 2007
192007
Feasibility analysis and soft constraints adjustment of CMMO
Y Xi, H Gu
Acta Automatica Sinica 24, 727-732, 1998
191998
Exact and heuristic methods for the resource-constrained net present value problem
H Gu, A Schutt, PJ Stuckey, MG Wallace, G Chu
Handbook on project management and scheduling vol. 1, 299-318, 2015
142015
Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time
刘琳, 谷寒雨, 席裕庚
Journal of Mechanical Engineering 44 (5), 68-75, 2008
142008
Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements
H Gu, A Kononov, J Memar, Y Zinder
Journal of Discrete Algorithms 52, 143-155, 2018
132018
A new algorithm for the computation of low frequency electro-mechanical oscillation modes of large power systems
G Han-yu, C Chen
PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 20 (9), 50-54, 2000
132000
Feasibility analysis and soft constraints adjustment of CMMO
X Yugeng, G Hanyu
Acta Automatica Sinica 24 (6), 726-731, 1998
131998
Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
Y Zuo, H Gu, Y Xi
International Journal of Production Research 46 (17), 4785-4801, 2008
112008
Bottleneck-based decomposition algorithm for large-scale flow shop scheduling problems
Y Zuo, H Gu, Y Xi
Control and Decision 21 (4), 425, 2006
112006
Improving problem reduction for 0–1 multidimensional knapsack problems with valid inequalities
H Gu
Computers & Operations Research 71, 82-89, 2016
102016
A decomposition and coordination scheduling method for flow-shop problem based on TOC
HY Zhang, YG Xi, HY Gu
Acta Automatica Sinica 31 (2), 182-187, 2005
102005
A multi-stage IP-based heuristic for class timetabling and trainer rostering
O Czibula, H Gu, A Russell, Y Zinder
Annals of Operations Research, 1-29, 2015
92015
A Multi-Stage IP-Based Heuristic for Class Timetabling and Trainer Rostering
O Czibula, H Gu, A Russell, Y Zinder
92014
Maximising the net present value of large resource-constrained projects
H Gu, PJ Stuckey, MG Wallace
International Conference on Principles and Practice of Constraint …, 2012
92012
Feasibility analysis of constrained multi-objective multi degree of freedom optimization control in industrial processes
X Yugeng, L Kang
Control Theory & Applications 12 (5), 590-596, 1995
91995
The system can't perform the operation now. Try again later.
Articles 1–20