Hyunsoo Kim
Hyunsoo Kim
GYEONGNAM NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY
Verified email at gntech.ac.kr
TitleCited byYear
Framework for work-space planning using four-dimensional BIM in construction projects
B Choi, HS Lee, M Park, YK Cho, H Kim
Journal of Construction Engineering and Management 140 (9), 04014041, 2014
512014
Construction risk assessment using site influence factors
HS Lee, H Kim, M Park, E Ai Lin Teo, KP Lee
Journal of computing in civil engineering 26 (3), 319-330, 2011
382011
Automated hazardous area identification using laborers' actual and optimal routes
H Kim, HS Lee, M Park, BY Chung, S Hwang
Automation in Construction 65, 21-32, 2016
282016
Collective sensing of workers' gait patterns to identify fall hazards in construction
K Yang, CR Ahn, MC Vuran, H Kim
Automation in Construction 82, 166-178, 2017
242017
Information retrieval framework for hazard identification in construction
H Kim, HS Lee, M Park, BY Chung, S Hwang
Journal of Computing in Civil Engineering 29 (3), 04014052, 2013
232013
Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction
M Park, S Ha, HS Lee, Y Choi, H Kim, S Han
Automation in Construction 32, 88-95, 2013
232013
Identifying safety hazards using collective bodily responses of workers
H Kim, CR Ahn, K Yang
Journal of Construction Engineering and Management 143 (2), 04016090, 2016
202016
Automated time-series cost forecasting system for construction materials
S Hwang, M Park, HS Lee, H Kim
Journal of Construction Engineering and Management 138 (11), 1259-1269, 2012
172012
Weather-delay simulation model based on vertical weather profile for high-rise building construction
M Jung, M Park, HS Lee, H Kim
Journal of construction engineering and management 142 (6), 04016007, 2016
162016
A real-time location-based construction labor safety management system
KP Lee, HS Lee, M Park, H Kim, S Han
Journal of Civil Engineering and Management 20 (5), 724-736, 2014
162014
Application of dynamic time warping to the recognition of mixed equipment activities in cycle time measurement
H Kim, CR Ahn, D Engelhaupt, SH Lee
Automation in Construction 87, 225-234, 2018
152018
Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: Case analysis using system dynamics
S Hwang, M Park, HS Lee, SH Lee, H Kim
Journal of construction engineering and management 141 (3), 04014081, 2014
152014
A Construction safety management system based on Building Information Modeling and Real-time Locating System
HS Lee, KP Lee, MS Park, HS Kim, SB Lee
Korean Journal of Construction Engineering and Management 10 (6), 135-145, 2009
132009
Assessing the effects of slippery steel beam coatings to ironworkers' gait stability
H Kim, CR Ahn, TL Stentz, H Jebelli
Applied ergonomics 68, 72-79, 2018
122018
Automated information retrieval for hazard identification in construction sites
H Kim, HS Lee, M Park, B Choi
Computing in Civil Engineering (2013), 897-904, 2013
112013
Influence factor-based safety risk assessment methodology for construction site
H Kim, HS Lee, M Park, KP Lee
Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010
92010
Influence factors of learning-curve effect in high-rise building constructions
B Lee, HS Lee, M Park, H Kim
Journal of Construction Engineering and Management 141 (8), 04015019, 2015
82015
Dynamic feasibility analysis of the housing supply strategies in a recession: Korean housing market
S Hwang, M Park, HS Lee, SH Lee, H Kim
Journal of Construction Engineering and Management 139 (2), 148-160, 2012
82012
A people-centric sensing approach to detecting sidewalk defects
H Kim, CR Ahn, K Yang
Advanced Engineering Informatics 30 (4), 660-671, 2016
72016
Development of real-time locating system for construction safety management
KP Lee, HS Lee, MS Park, HS Kim, YJ Baek
Korean Journal of Construction Engineering and Management 11 (2), 106-115, 2010
72010
The system can't perform the operation now. Try again later.
Articles 1–20