Follow
Ehsan Moosavi
Ehsan Moosavi
Department of Petroleum and Mining Engineering, South Tehran Branch, Islamic Azad University, Tehran
Verified email at azad.ac.ir
Title
Cited by
Cited by
Year
A new mathematical programming model for long-term production scheduling considering geological uncertainty
J Gholamnejad, E Moosavi
Journal of the Southern African Institute of Mining and Metallurgy 112 (2 …, 2012
322012
A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Mining Science 50, 1047-1060, 2014
202014
Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit
R Esmaeil, M Ehsan, S Reza, G Mehran
Journal of Central South University 25 (6), 1475-1488, 2018
192018
Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Central South University 21, 2848-2856, 2014
192014
An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
International Journal of Mining, Reclamation and Environment 35 (2), 115-140, 2021
172021
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Gospodarka Surowcami Mineralnymi 30, 2014
172014
Twin tunnel behavior under static and dynamic loads of Shiraz metro, Iran
R Shirinabadi, E Moosavi
Journal of mining science 52 (3), 461-472, 2016
162016
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade
E Moosavi, J Gholamnejad
Journal of Mining Science 52, 956-964, 2016
142016
Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal
Engineering Optimization 53 (5), 735-753, 2021
122021
Numerical modeling of ground movement due to twin tunnel structure of esfahan subway, Iran
E Moosavi, R Shirinabadi, E Rahimi, M Gholinejad
Journal of mining science 53, 663-675, 2018
112018
Prediction of seepage water pressure for slope stability at the Gol-E-Gohar open pit mine
E Moosavi, R Shirinabadi, M Gholinejad
Journal of Mining Science 52, 1069-1079, 2016
112016
Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
J. Cent. South Univ 27, 2479-2493, 2020
82020
Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging
E Moosavi, J Gholamnejad
Journal of Mining Science 51, 1226-1234, 2015
82015
Effect of transversely bedding layer on the biaxial failure mechanism of brittle materials
H Haeri, V Sarfarazi, Z Zhu, E Moosavi
Structural Engineering and Mechanics, An Int'l Journal 69 (1), 11-20, 2019
62019
Optimal mill cut-off grade modeling in the mineral deposits via MIP: Haftcheshmeh copper deposit
M Gholinejad, E Moosavi
Journal of Mining Science 52, 732-739, 2016
62016
A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertainty
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Mining and Environment 11 (3), 721-736, 2020
52020
Application of distinct element method to analyze the fracture and in-situ stress on wellbore stability under triaxial compression
R Shirinabadi, E Moosavi, M Gholinejad
Indian Geotechnical Journal 51 (6), 1384-1398, 2021
42021
Three-dimensional probabilistic analysis of the surface settlement based on spatial variability of soil properties: case study Zarbalizadeh NATM Tunnel
MA Tahmasebi, R Shirinabadi, E Rahimi, E Moosavi, AH Bangian Tabrizi
Geotechnical and Geological Engineering 40 (10), 4895-4910, 2022
32022
An effective MIP model based on grey wolf optimizer for lot-sizing LTPSOP in open-pit mines under uncertainty
K Tolouei, E Moosavi, M Gholinejad
Arabian Journal of Geosciences 14 (17), 1712, 2021
32021
Production scheduling problem and solver improvement via integration of the grey wolf optimizer into the augmented Lagrangian relaxation method
K Tolouei, E Moosavi
SN Applied Sciences 2 (12), 1963, 2020
32020
The system can't perform the operation now. Try again later.
Articles 1–20