Multi-product inventory planning with downward substitution, stochastic demand and setup costs US Rao, JM Swaminathan, J Zhang IIE Transactions 36 (1), 59-71, 2004 | 185 | 2004 |
Properties of the periodic review (R, T) inventory control policy for stationary, stochastic demand US Rao Manufacturing & Service Operations Management 5 (1), 37-53, 2003 | 160 | 2003 |
Development of a rapid-response supply chain at Caterpillar U Rao, A Scheller-Wolf, S Tayur Operations Research 48 (2), 189-204, 2000 | 131 | 2000 |
Managing inventory and supply performance in assembly systems with random supply capacity and demand R Bollapragada, US Rao, J Zhang Management Science 50 (12), 1729-1743, 2004 | 117 | 2004 |
The 2Bin system for controlling medical supplies at point-of-use CR Rosales, M Magazine, U Rao European Journal of Operational Research 243 (1), 271-280, 2015 | 80 | 2015 |
Demand and production management with uniform guaranteed lead time US Rao, JM Swaminathan, J Zhang Production and Operations Management 14 (4), 400-412, 2005 | 76 | 2005 |
Managing two-stage serial inventory systems under demand and supply uncertainty and customer service level requirements R Bollapragada, US Rao, J Zhang IIE transactions 36 (1), 73-85, 2004 | 65 | 2004 |
Managing operating room efficiency and responsiveness for emergency and elective surgeries—a literature survey YB Ferrand, MJ Magazine, US Rao IIE Transactions on Healthcare Systems Engineering 4 (1), 49-64, 2014 | 61 | 2014 |
Firefighter staffing including temporary absences and wastage MJ Fry, MJ Magazine, US Rao Operations research 54 (2), 353-365, 2006 | 58 | 2006 |
Point‐of‐Use hybrid inventory policy for hospitals CR Rosales, M Magazine, U Rao Decision Sciences 45 (5), 913-937, 2014 | 57 | 2014 |
Partially flexible operating rooms for elective and emergency surgeries YB Ferrand, MJ Magazine, US Rao Decision Sciences 45 (5), 819-847, 2014 | 55 | 2014 |
Building cyclic schedules for emergency department physicians Y Ferrand, M Magazine, US Rao, TF Glass Interfaces 41 (6), 521-533, 2011 | 53 | 2011 |
Reconfiguring a remanufacturing line at Visteon, Mexico S Kekre, US Rao, JM Swaminathan, J Zhang Interfaces 33 (6), 30-43, 2003 | 51 | 2003 |
Electric vehicle adoption decisions in a fleet environment S Kuppusamy, MJ Magazine, U Rao European Journal of Operational Research 262 (1), 123-135, 2017 | 50 | 2017 |
Some complexity results in cyclic scheduling ST McCormick, US Rao Mathematical and Computer Modelling 20 (2), 107-122, 1994 | 50 | 1994 |
Replenishment planning in discrete-time, capacitated, non-stationary, stochastic inventory systems R Bollapragada, US Rao IIE Transactions 38 (7), 605-617, 2006 | 48 | 2006 |
Comparing two operating-room-allocation policies for elective and emergency surgeries Y Ferrand, M Magazine, U Rao Proceedings of the 2010 winter simulation conference, 2364-2374, 2010 | 43 | 2010 |
Setting planned orders in master production scheduling under demand uncertainty K Feng, US Rao, A Raturi International Journal of Production Research 49 (13), 4007-4025, 2011 | 35 | 2011 |
Managing responsiveness in the emergency department: Comparing dynamic priority queue with fast track YB Ferrand, MJ Magazine, US Rao, TF Glass Journal of Operations Management 58, 15-26, 2018 | 30 | 2018 |
Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines R Bollapragada, U Rao Management Science 45 (6), 889-904, 1999 | 29 | 1999 |