The resource leveling problem with multiple resources using an adaptive genetic algorithm
JL Ponz-Tienda, V Yepes, E Pellicer, J Moreno-Flores
Automation in Construction 29, 161-172, 2013
782013
Complete fuzzy scheduling and fuzzy earned value management in construction projects
JL Ponz-Tienda, E Pellicer, V Yepes
Journal of Zhejiang University-Science A 13 (1), 56-68, 2012
352012
Method for generation of rheological model to characterize non-conventional injection molding by means of spiral mold
I Claveria, C Javierre, L Ponz
Journal of Materials Processing Technology 162, 477-483, 2005
352005
Influence of the recycled material percentage on the rheological behaviour of HDPE for injection moulding process
C Javierre, I Claveria, L Ponz, J Aísa, A Fernández
Waste management 27 (5), 656-663, 2007
312007
The fuzzy project scheduling problem with minimal generalized precedence relations
JL Ponz‐Tienda, E Pellicer, J Benlloch‐Marco, C Andrés‐Romano
Computer‐Aided Civil and Infrastructure Engineering 30 (11), 872-891, 2015
282015
A proposal for risk allocation in social infrastructure projects applying PPP in Colombia
LM Sastoque, CA Arboleda, JL Ponz
Procedia Engineering 145, 1354-1361, 2016
272016
Labor productivity in the construction industry-factors influencing the Spanish construction labor productivity
G Robles, A Stifi, JL Ponz-Tienda, S Gentes
International Journal of Civil, Environmental, Structural, Construction and …, 2014
232014
Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity-
SG G. Robles, A. Stifi, JL. Ponz-Tienda
International Journal of Civil, Architectural, Structural and Construction …, 2014
23*2014
A parallel branch and bound algorithm for the resource leveling problem with minimal lags
JL Ponz‐Tienda, A Salcedo‐Bernal, E Pellicer
Computer‐Aided Civil and Infrastructure Engineering 32 (6), 474-498, 2017
182017
La decisión multicriterio: aplicación en la selección de ofertas competitivas en edificación
A Casañ
Valencia: Universidad Politécnica de Valencia (UPV). España, 2013
18*2013
Improved adaptive harmony search algorithm for the resource leveling problem with minimal lags
JL Ponz-Tienda, A Salcedo-Bernal, E Pellicer, J Benlloch-Marco
Automation in Construction 77, 82-92, 2017
172017
Interoperability of building energy modeling (BEM) with building information modeling (BIM)
AV Prada-Hernández, JS Rojas-Quintero, JA Vallejo-Borda, ...
Proceedings of the SIBRAGEC ELAGEC, 519-526, 2015
162015
The Last Planner System of Construction Planning and Control as a Teaching and Learning Tool
E Pellicer, F Cerveró, A Lozano, JL Ponz-Tienda
INTED2015 Proceedings, 9th International Technology, Education and …, 2015
132015
Reforma, interiorismo y diseño de mobiliario para una vivienda antigua
PC Marchante
132011
A matrix algorithm RUPSP / GRUPSP "no splitting allowed" for production planning under Lean Construction methodology based on production processes
JL Ponz-Tienda, J BENLLOCH MARCO, C ANDRÉS ROMANO, ...
Revista de la construcción 10 (2), 90-103, 2011
10*2011
TEACHING AND LEARNING LEAN CONSTRUCTION IN SPAIN: A PIONEER EXPERIENCE
E Pellicer, JL Ponz-Tienda
22nd ANNUAL CONFERENCE of the INTERNATIONAL GROUP for LEAN CONSTRUCTON …, 2014
92014
Last Planner System: un caso de estudio
I Sanchis Mestre
9*2013
Integrating task fragmentation and earned value method into the Last Planner System using spreadsheets
JL Ponz-Tienda, E Pellicer, LF Alarcón, JS Rojas-Quintero
IGLC 23, 63, 2015
82015
A Route Map for Implementing Last Planner® System in Bogotá, Colombia
C Mejía-Plata, JS Guevara-Ramirez, DF Moncaleano-Novoa, ...
24th Annual Conference of the International Group for Lean Construction …, 2016
72016
The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
JD García‐Nieves, JL Ponz‐Tienda, A Salcedo‐Bernal, E Pellicer
Computer‐Aided Civil and Infrastructure Engineering, 2018
62018