Christopher Rausch
TitleCited byYear
Managing risk in modular construction using dimensional and geometric tolerance strategies
Y Shahtaheri, C Rausch, J West, C Haas, M Nahangi
Automation in construction 83, 303-315, 2017
222017
Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds
C Rausch, M Nahangi, C Haas, J West
Automation in Construction 75, 33-44, 2017
112017
Optimum assembly planning for modular construction components
C Rausch, M Nahangi, M Perreault, CT Haas, J West
Journal of computing in civil engineering 31 (1), 04016039, 2016
102016
Deconstruction programming for adaptive reuse of buildings
B Sanchez, C Rausch, C Haas
Automation in Construction 107, 102921, 2019
22019
Deviation Analyses: A Tool for Quantifying Dimensional Quality and Alignment in Modular Construction
C Rausch, M Nahangi, C Haas, J West, M Perreault
22016
Optimum Assembly Planning for Modular Construction Using BIM and 3D Point Clouds
M Nahangi, C Rausch, C Haas
Modular and Offsite Construction (MOC) Summit Proceedings 1 (1), 2016
12016
Framework for the Strategic Management of Dimensional Variability of Structures in Modular Construction
C Rausch
University of Waterloo, 2016
12016
Arbitrary 3D object extraction from cluttered laser scans using local features
M Nahangi, T Czerniawski, C Rausch, C Haas
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2016
12016
Applying the Concept of Selective Assembly to Modular Construction to Mitigate Impacts of Component Variability
C Rausch, M Nahangi, M Perreault, C Haas, J West
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2016
12016
Risk Mitigation through Tolerance Strategies for Design in Modularization
Y SHAHTAHERI, C RAUSCH, J WEST, C HAAS, M NAHANGI
12015
Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction
C Rausch, M Nahangi, C Haas, W Liang
Automation in Construction 103, 300-314, 2019
2019
Selective Deconstruction Programming for Adaptive Reuse of Buildings
B Sanchez, C Rausch, C Haas
Computing in Civil Engineering 2019: Data, Sensing, and Analytics, 225-232, 2019
2019
Spatial Parameterization of Non-Semantic CAD Elements for Supporting Automated Disassembly Planning
C Rausch, B Sanchez, C Haas
Modular and Offsite Construction Summit (MOC) 2019, 2019
2019
Multi-objective Optimization Analysis for Selective Disassembly Planning of Buildings
B Sanchez, C Rausch, C Haas, R Saari
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
2019
Dimensional variability analysis of construction assemblies using kinematics chains and building information models
M Nahangi, C Rausch, CT Haas, J West
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2017
2017
Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project
C Rausch, L Zhang, J West, CH Haas
Modular and Offsite Construction (MOC) Summit Proceedings 1 (1), 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–16