Sequencing and scheduling in robotic cells: Recent developments M Dawande, HN Geismar, SP Sethi, C Sriskandarajah Journal of Scheduling 8, 387-426, 2005 | 302 | 2005 |
The integrated production and transportation scheduling problem for a product with a short lifespan HN Geismar, G Laporte, L Lei, C Sriskandarajah INFORMS Journal on Computing 20 (1), 21-33, 2008 | 234 | 2008 |
Integrated production and distribution scheduling with a perishable product P Devapriya, W Ferrell, N Geismar European Journal of Operational Research 259 (3), 906-916, 2017 | 197 | 2017 |
Throughput optimization in robotic cells MW Dawande, HN Geismar, SP Sethi, C Sriskandarajah Springer Science & Business Media, 2007 | 166 | 2007 |
Supply chain scheduling: distribution systems M Dawande, HN Geismar, NG Hall, C Sriskandarajah Production and Operations Management 15 (2), 243-261, 2006 | 148 | 2006 |
Maximizing revenue through two‐dimensional shelf‐space allocation HN Geismar, M Dawande, BPS Murthi, C Sriskandarajah Production and Operations Management 24 (7), 1148-1163, 2015 | 82 | 2015 |
Increasing throughput for robotic cells with parallel machines and multiple robots HN Geismar, C Sriskandarajah, N Ramanan IEEE Transactions on Automation Science and Engineering 1 (1), 84-89, 2004 | 77 | 2004 |
Throughput optimization in dual-gripper interval robotic cells M Dawande, HN Geismar, M Pinedo, C Sriskandarajah Iie Transactions 42 (1), 1-15, 2009 | 66 | 2009 |
A framework to analyze cash supply chains D Rajamani, HN Geismar, C Sriskandarajah Production and Operations Management 15 (4), 544-552, 2006 | 65 | 2006 |
Robotic cells with parallel machines: Throughput maximization in constant travel-time cells HN Geismar, M Dawande, C Sriskandarajah Journal of Scheduling 7, 375-395, 2004 | 64 | 2004 |
Planning and scheduling in healthcare for better care coordination: Current understanding, trending topics, and future opportunities S Youn, HN Geismar, M Pinedo Production and Operations Management 31 (12), 4407-4423, 2022 | 56 | 2022 |
Dominance of cyclic solutions and challenges in the scheduling of robotic cells HN Geismar, MW Dawande, SP Sethi SIAM review 47 (4), 709-721, 2005 | 54 | 2005 |
Robotic cells with parallel machines and multiple dual gripper robots: a comparative overview HN Geismar, M Pinedo, C Sriskandarajah Iie Transactions 40 (12), 1211-1227, 2008 | 49 | 2008 |
Throughput optimization in constant travel‐time dual gripper robotic cells with parallel machines HN Geismar, M Dawande, C Sriskandarajah Production and Operations Management 15 (2), 311-328, 2006 | 48 | 2006 |
Approximation algorithms for k-unit cyclic solutions in robotic cells HN Geismar, M Dawande, C Sriskandarajah European Journal of Operational Research 162 (2), 291-309, 2005 | 47 | 2005 |
Batch scheduling on parallel machines with dynamic job arrivals and incompatible job families E Cakici, SJ Mason, JW Fowler, HN Geismar International Journal of Production Research 51 (8), 2462-2477, 2013 | 45 | 2013 |
Improving remanufacturing core recovery and profitability through seeding JD Abbey, HN Geismar, GC Souza Production and Operations Management 28 (3), 610-627, 2019 | 40 | 2019 |
Productivity improvement from using machine buffers in dual-gripper cluster tools N Geismar, M Dawande, C Sriskandarajah IEEE Transactions on Automation Science and Engineering 8 (1), 29-41, 2010 | 39 | 2010 |
Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models IG Drobouchevitch, HN Geismar, C Sriskandarajah European Journal of Operational Research 206 (3), 623-633, 2010 | 38 | 2010 |
Approximations to Optimal k‐Unit Cycles for Single‐Gripper and Dual‐Gripper Robotic Cells HN Geismar, LMA Chan, M Dawande, C Sriskandarajah Production and Operations Management 17 (5), 551-563, 2008 | 36 | 2008 |