Follow
Kamyar Tolouei
Kamyar Tolouei
Ph.D., Department of Petroleum and Mining Engineering, South Tehran Branch, Islamic Azad University
Verified email at azad.ac.ir
Title
Cited by
Cited by
Year
An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
International Journal of Mining, Reclamation and Environment 35 (2), 115-140, 2021
172021
Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal
Engineering Optimization 53 (5), 735-753, 2021
122021
Fuzzy evaluation method for the identification of subsidence susceptibility in an underground mine (case study in Tabas coal mine of Iran)
N Hosseini Alaee, A Mozafari, M Mirzaee, A Faghihi, K Tolouei
Natural Hazards 99, 797-806, 2019
102019
Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms
K Tolouei, E Moosavi, AHB Tabrizi, P Afzal, AA Bazzazi
J. Cent. South Univ 27, 2479-2493, 2020
82020
A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertainty
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Mining and Environment 11 (3), 721-736, 2020
52020
An effective MIP model based on grey wolf optimizer for lot-sizing LTPSOP in open-pit mines under uncertainty
K Tolouei, E Moosavi, M Gholinejad
Arabian Journal of Geosciences 14 (17), 1712, 2021
32021
Production scheduling problem and solver improvement via integration of the grey wolf optimizer into the augmented Lagrangian relaxation method
K Tolouei, E Moosavi
SN Applied Sciences 2 (12), 1963, 2020
32020
Optimization of the production scheduling problem in open-pit mines to maximize the net present value using the human mental search algorithm
K Tolouei, E Moosavi
Arabian Journal of Geosciences 16 (1), 16, 2023
12023
A new approach for solving the open pit mines long-term production scheduling problem optimization by bat algorithm
K Tolouei, E Moosavi, AH Bangian, P Afzal, AA Bazzazi
19th International Multidisciplinary Scientific GeoConference SGEM, 23-30, 2019
12019
A hybrid particle swarm optimization solution to constrained long-term production scheduling at open pit mining
K Tolouei, E Moosavi, AH Bangian, P Afzal, AA Bazzazi
19th International Multidisciplinary Scientific GeoConference SGEM, 15-22, 2019
12019
Solving LTPSOP in open-pit mines using Gaussian process and human mental search
K Tolouei, E Moosavi, M Gholinejad
OPSEARCH, 1-32, 2024
2024
Assessment of toxic element dispersal in water, sediments, and soil of gold mining tailing dams due to natural seepage: a case study
K Tolouei, E Moosavi, M Gholinejad
Arabian Journal of Geosciences 16 (6), 371, 2023
2023
Capabilities and challenges of big data application in tunneling: Recent advances and future trends
K Tolouei, E Moosavi, M Gholinejad
Expanding Underground-Knowledge and Passion to Make a Positive Impact on the …, 2023
2023
An Integer Mathematical Programming Model for Production Scheduling Problem in Open-Pit Mines under Grade Uncertainty and Solving Using the Firefly Algorithm
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Mining Engineering 16 (52), 24-40, 2021
2021
Optimization of the long-term production scheduling model by considering the grade uncertainty by the Lagrangian relaxation method-bat algorithm
K Tolouei, E Moosavi, A Bangian Tabrizi, P Afzal, A Aghajani Bazazi
Journal of Analytical and Numerical Methods in Mining Engineering 10 (24), 13-26, 2020
2020
混合算法改善品位不确定露天矿生产调度问题的性能
K Tolouei, E Moosavi, AH Bangian Tabrizi, P Afzal, A Aghajani Bazzazi
Journal of Central South University 27, 2479-2493, 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–16