Follow
Mahmood Hosseini
Mahmood Hosseini
EMU, N. Cyprus/IIEES/University of Tehran/IAU
Verified email at emu.edu.tr - Homepage
Title
Cited by
Cited by
Year
Towards resilient communities in developing countries through education of children for disaster preparedness
YO Izadkhah, M Hosseini
International journal of emergency management 2 (3), 138-148, 2005
1792005
Post-Bam earthquake: recovery and reconstruction
M Ghafory-Ashtiany, M Hosseini
Natural Hazards 44, 229-241, 2008
1252008
Earthquake disaster risk management planning in schools
M Hosseini, YO Izadkhah
Disaster Prevention and Management: An International Journal 15 (4), 649-661, 2006
682006
Seismic failure probability of a 400 kV power transformer using analytical fragility curves
SA Zareei, M Hosseini, M Ghafory-Ashtiany
Engineering Failure Analysis 70, 273-289, 2016
572016
Evaluation of power substation equipment seismic vulnerability by multivariate fragility analysis: A case study on a 420 kV circuit breaker
SA Zareei, M Hosseini, M Ghafory-Ashtiany
Soil dynamics and earthquake engineering 92, 79-94, 2017
532017
Resource allocation for regional earthquake risk mitigation: a case study of Tehran, Iran
P Vaziri, RA Davidson, LK Nozick, M Hosseini
Natural hazards 53, 527-546, 2010
472010
Reduction of seismic sloshing in floating roof liquid storage tanks by using a Suspended Annular Baffle (SAB)
M Hosseini, MA Goudarzi, A Soroor
Journal of Fluids and Structures 71, 40-55, 2017
402017
Seismic design evaluation of reinforced concrete buildings for near-source earthquakes by using nonlinear time history analyses
M Hosseini, B Hashemi, Z Safi
Procedia Engineering 199, 176-181, 2017
342017
Training emergency managers for earthquake response: challenges and opportunities
M Hosseini, YO Izadkhah
Disaster Prevention and Management: An International Journal 19 (2), 185-198, 2010
342010
Simplified formulation for modeling the nonlinear behavior of confined masonry walls in seismic analysis
F Ranjbaran, M Hosseini, M Soltani
International Journal of Architectural Heritage 6 (3), 259-289, 2012
302012
Sustainable neighbourhood earthquake emergency planning in megacities
YO Izadkhah, M Hosseini
Disaster Prevention and Management: An International Journal 19 (3), 345-357, 2010
302010
People’s perspectives and expectations on preparedness against earthquakes: Tehran case study
K Jahangiri, YO Izadkhah, A Montazeri, M Hosseini
Journal of injury and violence research 2 (2), 85, 2010
302010
A quick method for estimating the lateral stiffness of building systems
M Hosseini, MR Imagh‐e‐Naiini
The Structural Design of Tall Buildings 8 (3), 247-260, 1999
301999
Identification of modal parameters of non‐classically damped linear structures under multi‐component earthquake loading
M Mahmoudabadi, M Ghafory‐Ashtiany, M Hosseini
Earthquake engineering & structural dynamics 36 (6), 765-782, 2007
282007
Using Orthogonal Pairs of Rollers on Concave Beds (OPRCB) as a base isolation system—part i: analytical, experimental and numerical studies of OPRCB isolators
M Hosseini, A Soroor
The Structural Design of Tall and Special Buildings 20 (8), 928-950, 2011
272011
Guidelines for design of temporary shelters after earthquakes based on community participation
AJ Forouzandeh, M Hosseini, M Sadeghzadeh
World Conference on Earthquake Engineering, 2008
272008
Parametric design of diagrid tall buildings regarding structural efficiency
A Ardekani, I Dabbaghchian, M Alaghmandan, M Golabchi, SM Hosseini, ...
Architectural Science Review 63 (1), 87-102, 2020
262020
Study of vertical seismic isolation technique with nonlinear viscous dampers for lateral response reduction
R Milanchian, M Hosseini
Journal of Building Engineering 23, 144-154, 2019
262019
Telescopic columns as a new base isolation system for vibration control of high-rise buildings
M Hosseini, EN Farsangi
Earthquakes and Structures 3 (6), 853-867, 2012
262012
Simplification of earthquake accelerograms for quick time history analyses by using their modified inverse fourier transforms
A Faroughi, M Hosseini
Procedia Engineering 14, 2872-2877, 2011
262011
The system can't perform the operation now. Try again later.
Articles 1–20