Follow
Mohamed Shawky Abdelmonem Abdelrehim
Mohamed Shawky Abdelmonem Abdelrehim
Assisstant Professor, Shoubra Faculity of Engineering, Benha University
Verified email at feng.bu.edu.eg
Title
Cited by
Cited by
Year
Factors causing rework and their impact on projects’ performance in Egypt
AM Al-Janabi, MS Abdel-Monem, KM El-Dash
Journal of Civil Engineering and Management 26 (7), 666-689, 2020
392020
Email-based system for documenting construction as-built details
T Hegazy, M Abdel-Monem
Automation in Construction 24, 130-137, 2012
382012
Hands-On Exercise for Enhancing Students’ Construction Management Skills
T Hegazy, M Abdel-Monem, DA Saad, R Rashedi
Journal of Construction Engineering and Management 139 (9), 1135-1143, 2013
292013
Risk factors causing cost overruns in road networks
T Ammar, M Abdel-Monem, K El-Dash
Ain Shams Engineering Journal 13 (5), 101720, 2022
282022
Enhancing construction as-built documentation using interactive voice response
M Abdel-Monem, T Hegazy
Journal of construction engineering and management 139 (7), 895-898, 2013
282013
Framework for enhanced progress tracking and control of linear projects
T Hegazy, M Abdel-Monem, D Atef Saad
Engineering, Construction and Architectural Management 21 (1), 94-110, 2014
252014
Balanced scorecard model for water utilities in Egypt
M Abdelghany, M Abdel-Monem
Water Practice and Technology 14 (1), 203-216, 2019
132019
Prospects of mind maps for better visualization of infrastructure literature
T Hegazy, A Ali, M Abdel-Monem
Journal of Professional Issues in Engineering Education & Practice 137 (4 …, 2011
122011
Multi-objective schedule optimization using constraint programming
W Menesi, M Abdel-Monem, T Hegazy, Z Abuwarda
102015
Assessing Risk Factors Affecting the Accuracy of Conceptual Cost Estimation in the Middle East
M Abdel-Monem, KT Alshaer, K El-Dash
Buildings 12 (7), 950, 2022
62022
Potential risks in civil infrastructure projects in Egypt
K El-Dash, MA Monem
Proceedings of III IPMA-ICEC International Expert Seminar, Bilbao, Spain, 6-8, 2004
62004
Simplified IT tools for site information tracking
M Abdel-Monem, T Hegazy
Annual Conference of the Canadian Society for Civil Engineering 2011, CSCE …, 2011
42011
Modeling financial risk contributes to construction projects; case study of expansion food industries
NA Gad, M Abdel-Monem, K El-Dash, M Abdel-Hamid
HBRC Journal 18 (1), 85-106, 2022
32022
COST OVERRUN GAP ANALYSIS IN CONSTRUCTION PROJECTS: STATE-OF-THE-ART
M Abdel-Monem, AR El-Mohr, K El-Dash
Engineering Research Journal-Faculty of Engineering (Shoubra) 51 (3), 76-97, 2022
32022
Appropriate budget contingency determination for construction projects: State-of-the-art
T Ammar, M Abdel-Monem, K El-Dash
Alexandria Engineering Journal 78, 88-103, 2023
22023
AN INTENSIVE REVIEW ON HEALTH AND SAFELY FACTORS AFFECTING CONSTRUCTION PROJECTS'PRODUCTIVITY
KM El-Dash, MS Abdel Monem, RL Mohammed Salih
Journal of Al-Azhar University Engineering Sector 17 (62), 133-145, 2022
22022
Automated system for documenting the evolution of as-built details during construction
M Abdel-Monem, T Hegazy, DA Saad
Transportation Research Board (TRB) 91st Annual Meeting, 2012
22012
Float loss impact on project cost
M Magdy, M Abdel-Monem, K El Dash
International Journal of Construction Management 22 (9), 1647-1656, 2022
12022
STUDYING THE LEVEL OF SERVICE OF TWO SIDED WEAVING SECTION ON URBAN ROADS
I RAMADAN, M ABDEL-MONEM, MA IBRAHIM
Engineering Research Journal-Faculty of Engineering (Shoubra) 51 (3), 67-75, 2022
12022
Selection of Intersection Control Type in Urban Areas
IMI Ramadan, MS Abdel-Monem, OH Ahmed
Civil and Environmental Engineering 18 (1), 164-173, 2022
12022
The system can't perform the operation now. Try again later.
Articles 1–20