Damla Kızılay
Damla Kızılay
İzmir Democracy University, Industrial Engineering Department
Verified email at idu.edu.tr
Title
Cited by
Cited by
Year
Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
MF Tasgetiren, D Kizilay, QK Pan, PN Suganthan
Computers & Operations Research 77, 111-126, 2017
642017
A variable block insertion heuristic for the blocking flowshop scheduling problem with total flowtime criterion
MF Tasgetiren, QK Pan, D Kizilay, K Gao
Algorithms 9 (4), 71, 2016
242016
A differential evolution algorithm with variable neighborhood search for multidimensional knapsack problem
MF Tasgetiren, QK Pan, D Kizilay, G Suer
2015 IEEE Congress on Evolutionary Computation (CEC), 2797-2804, 2015
162015
A populated local search with differential evolution for blocking flowshop scheduling problem
MF Tasgetiren, QK Pan, D Kizilay, G Suer
2015 IEEE Congress on Evolutionary Computation (CEC), 2789-2796, 2015
132015
An iterated greedy algorithm for the hybrid flowshop problem with makespan criterion
D Kizilay, MF Tasgetiren, QK Pan, L Wang
2014 IEEE Symposium on Computational Intelligence in Production and†…, 2014
122014
A differential evolution algorithm with a variable neighborhood search for constrained function optimization
MF Tasgetiren, PN Suganthan, S Ozcan, D Kizilay
Adaptation and hybridization in computational intelligence, 171-184, 2015
92015
A variable block insertion heuristic for permutation flowshops with makespan criterion
MF Tasgetiren, QK Pan, D Kizilay, MC Vťlez-Gallego
2017 IEEE Congress on Evolutionary Computation (CEC), 726-733, 2017
82017
Constraint and mathematical programming models for integrated port container terminal operations
D Kizilay, DT Eliiyi, P Van Hentenryck
International Conference on the Integration of Constraint Programming†…, 2018
72018
An energy-efficient single machine scheduling with release dates and sequence-dependent setup times
MF Tasgetiren, U Eliiyi, H ÷ztop, D Kizilay, QK Pan
Proceedings of the Genetic and Evolutionary Computation Conference Companion†…, 2018
62018
A discrete artificial bee colony algorithm for the assignment and parallel machine scheduling problem in DYO paint company
D Kizilay, MF Tasgetiren, O Bulut, B Bostan
2014 IEEE Congress on Evolutionary Computation (CEC), 653-660, 2014
62014
A variable block insertion heuristic for solving permutation flow shop scheduling problem with makespan criterion
D Kizilay, MF Tasgetiren, QK Pan, L Gao
Algorithms 12 (5), 100, 2019
42019
A populated iterated greedy algorithm with inver-over operator for traveling salesman problem
MF Tasgetiren, O Buyukdagli, D Kızılay, K Karabulut
International Conference on Swarm, Evolutionary, and Memetic Computing, 1-12, 2013
42013
A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
D Kizilay, DT Eliiyi
Flexible Services and Manufacturing Journal, 1-42, 2020
22020
Constraint Programming Models for Integrated Container Terminal Operations
D Kizilay, P Van Hentenryck, DT Eliiyi
European Journal of Operational Research, 2020
12020
An Ensemble of Meta-Heuristics for the Energy-Efficient Blocking Flowshop Scheduling Problem
D Kizilay, MF Tasgetiren, QK Pan, G SŁer
Procedia Manufacturing 39, 1177-1184, 2019
12019
Constraint programming model for multi-manned assembly line balancing problem
ZA «il, D Kizilay
Computers & Operations Research 124, 105069, 2020
2020
Mathematical models for the periodic vehicle routing problem with time windows and time spread constraints
H ÷ztop, D Kizilay, ZA «il
An International Journal of Optimization and Control: Theories†…, 2020
2020
A Novel Differential Evolution Algorithm with Q-Learning for Economical and Statistical Design of X-Bar Control Charts
AA Al-Buenain, D Kizilay, O Buyukdagli, MF Tasgetiren
2020 IEEE Congress on Evolutionary Computation (CEC), 1-8, 2020
2020
A Differential Evolution Algorithm with Q-Learning for Solving Engineering Design Problems
D Kizilay, MF Tasgetiren, H Oztop, L Kandiller, PN Suganthan
2020 IEEE Congress on Evolutionary Computation (CEC), 1-8, 2020
2020
Constraint programming approach for multi-objective two-sided assembly line balancing problem with multi-operator stations
D Kizilay, ZA «il
Engineering Optimization, 1-16, 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–20