Wenying Ji
TitleCited byYear
Intelligent approach to estimation of tunnel-induced ground settlement using wavelet packet and support vector machines
L Zhang, X Wu, W Ji, SM AbouRizk
Journal of Computing in Civil Engineering 31 (2), 04016053, 2016
132016
Credible interval estimation for fraction nonconforming: Analytical and numerical solutions
W Ji, SM AbouRizk
Automation in Construction 83, 56-67, 2017
122017
Simulation-based analytics for quality control decision support: pipe welding case study
W Ji, SM AbouRizk
Journal of Computing in Civil Engineering 32 (3), 05018002, 2018
92018
Complexity Analysis Approach for Prefabricated Construction Products Using Uncertain Data Clustering
W Ji, SM AbouRizk, OR Zaiane, Y Li
Journal of Construction Engineering and Management 144 (8), 04018063, 2018
62018
Data-driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains
W Ji, SM AbouRizk
Journal of Construction Engineering and Management 144 (8), 04018078, 2018
52018
A Bayesian inference based simulation approach for estimating fraction nonconforming of pipe spool welding processes
W Ji, S AbouRizk
2016 Winter Simulation Conference (WSC), 2935-2946, 2016
42016
Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis
M Lu, J Liu, W Ji
International Journal of Construction Management 17 (4), 251-263, 2017
32017
Bayesian Inference with Markov Chain Monte Carlo–Based Numerical Approach for Input Model Updating
L Wu, W Ji, SM AbouRizk
Journal of Computing in Civil Engineering 34 (1), 04019043, 2019
22019
Improving Tunneling Simulation Using Bayesian Updating And Hidden Markov Chains
M Werner, W Ji, S AbouRizk
2018 Winter Simulation Conference (WSC), 3930-3940, 2018
22018
Integrated data-driven approach for analyzing pipe welding operator-quality performance
W Ji, Y Li, SM AbouRizk
Automation in Construction 106, 102814, 2019
12019
Simulation-Based Analytics for Fabrication Quality-Associated Decision Support
W Ji
University of Alberta, 2018
12018
Implementing a Data-Driven Simulation Method for Quantifying Pipe Welding Operator Quality Performance
W Ji, SM AbouRizk
Joint Conference on Computing in Construction (JC3) 1, 79-86, 2017
12017
Simulation-based dynamic adjustments of prices and subsidies for transportation PPP projects based on stakeholders’ satisfaction
J Yuan, W Ji, J Guo, MJ Skibniewski
Transportation 46 (6), 2309-2345, 2019
2019
Assessing Disaster Impacts on Highways Using Social Media: Case Study of Hurricane Harvey
Y Chen, Q Wang, W Ji
arXiv preprint arXiv:1909.03362, 2019
2019
Enhanced Input Modeling for Construction Simulation using Bayesian Deep Neural Networks
Y Li, W Ji
arXiv preprint arXiv:1906.06421, 2019
2019
A Bayesian-Based Approach for Public Sentiment Modeling
Y Chen, Q Wang, W Ji
arXiv preprint arXiv:1904.02846, 2019
2019
Equipment Logistics Performance Measurement Using Data-Driven Social Network Analysis
C Liu, W Ji, SM AbouRizk, MFF Siu
Journal of Construction Engineering and Management 145 (5), 04019033, 2019
2019
Enhanced Welding Operator Quality Performance Measurement: Work Experience-Integrated Bayesian Prior Determination
Y Li, W Ji, SM AbouRizk
arXiv preprint arXiv:1901.00883, 2019
2019
Simulation-based assessment of the influence of requests for information on industrial module construction piping work
S Khafri, A.A. Ji, W. Ahn, S. AbouRizk
27th European Modeling and Simulation Symposium, EMSS 2015, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–19