Yelda Turkan
TitleCited byYear
Automated progress tracking using 4D schedule and 3D sensing technologies
Y Turkan, F Bosche, CT Haas, R Haas
Automation in construction 22, 414-421, 2012
2202012
The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components
F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas
Automation in Construction 49, 201-213, 2015
1512015
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas
Journal of computing in civil engineering 28 (4), 05014004, 2013
1072013
Toward automated earned value tracking using 3D imaging tools
Y Turkan, F Bosché, CT Haas, R Haas
Journal of construction engineering and management 139 (4), 423-433, 2012
652012
Tracking of secondary and temporary objects in structural concrete work
Y Turkan, FN Bosche, CT Haas, H Ralph
Construction Innovation: Information, Process, Management 14 (2), 2014
312014
IFC BIM-based facility management approach to optimize data collection for corrective maintenance
F Shalabi, Y Turkan
Journal of Performance of Constructed Facilities 31 (1), 04016081, 2016
302016
Lessons from using BIM to increase design-construction integration
GP Luth, A Schorer, Y Turkan
Practice periodical on structural design and construction 19 (1), 103-110, 2013
292013
Tracking secondary and temporary concrete construction objects using 3D imaging technologies
Y Turkan, F Bosché, CT Haas, R Haas
Computing in Civil Engineering (2013), 749-756, 2013
252013
Mobile augmented reality for teaching structural analysis
Y Turkan, R Radkowski, A Karabulut-Ilgu, AH Behzadan, A Chen
Advanced Engineering Informatics 34, 90-100, 2017
212017
System requirements for electrically conductive concrete heated pavements
H Abdualla, H Ceylan, S Kim, K Gopalakrishnan, PC Taylor, Y Turkan
Transportation Research Record 2569 (1), 70-79, 2016
192016
Towards automated progress tracking of erection of concrete structures
Y Turkan, F Bosche, CT Haas, R Haas
Proceedings of the 6th International Conference on Innovation in …, 2010
172010
Toward Automated Spatial Change Analysis of MEP Components using 3D Point Clouds and As-Designed BIM Models
VS Kalasapudi, Y Turkan, P Tang
2014 Workshop on 3D Computer Vision in the Built Environment, 2014
122014
Fusing 4D modeling and laser scanning for automated construction progress control
FN Bosche, Y Turkan, CT Haas, R Haas
26th ARCOM Annual Conference and Annual General Meeting, 1229-1238, 2010
122010
Civil information modeling adoption by Iowa and Missouri DOT
F Guo, Y Turkan, CT Jahren, H David Jeong
Computing in Civil and Building Engineering (2014), 463-471, 2014
112014
Adaptive wavelet neural network for terrestrial laser scanner-based crack detection
Y Turkan, J Hong, S Laflamme, N Puri
Automation in Construction 94, 191-202, 2018
102018
Civil integrated management: An emerging paradigm for civil infrastructure project delivery and management
F Guo, CT Jahren, Y Turkan, H David Jeong
Journal of Management in Engineering 33 (2), 04016044, 2016
102016
A novel framework for BIM enabled facility energy management: A concept paper
F Al-Shalabi, Y Turkan
Int. Construction Specialty Conf.(ICSC 15), 2015
82015
BrIM implementation for documentation of bridge condition for inspection
FA Al-Shalabi, Y Turkan, S Laflamme
Proceedings of the Canadian Society for Civil Engineering 5th International …, 2015
82015
Automated construction progress tracking using 3D sensing technologies
Y Turkan
University of Waterloo, 2012
72012
Computationally efficient change analysis of piece-wise cylindrical building elements for proactive project control
VS Kalasapudi, P Tang, Y Turkan
Automation in Construction 81, 300-312, 2017
62017
The system can't perform the operation now. Try again later.
Articles 1–20