Hiam Khoury
Hiam Khoury
Verified email at aub.edu.lb
Title
Cited by
Cited by
Year
Evaluation of position tracking technologies for user localization in indoor construction environments
HM Khoury, VR Kamat
Automation in Construction 18 (4), 444-457, 2009
2712009
Evaluation of position tracking technologies for user localization in indoor construction environments
HM Khoury, VR Kamat
Automation in construction 18 (4), 444-457, 2009
2712009
High-precision identification of contextual information in location-aware engineering applications
HM Khoury, VR Kamat
Advanced Engineering Informatics 23 (4), 483-496, 2009
502009
Evaluation of agent-based and discrete-event simulation for modeling construction earthmoving operations
E Zankoul, H Khoury, R Awwad
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2015
252015
Evaluation of general-purpose construction simulation and visualization tools for modeling and animating airside airport operations
HM Khoury, VR Kamat, PG Ioannou
Simulation 83 (9), 663-679, 2007
162007
Inertial-vision sensor fusion for pedestrian localization
D Chdid, R Oueis, H Khoury, D Asmar, I Elhajj
2011 IEEE International Conference on Robotics and Biomimetics, 1695-1701, 2011
152011
Indoor user localization for context-aware information retrieval in construction projects
HM Khoury, VR Kamat
Automation in Construction 18 (4), 444-457, 2009
152009
WLAN based user position tracking for contextual information access in indoor construction environments
HM Khoury, VR Kamat
Computing in Civil Engineering (2007), 838-845, 2007
152007
Automated Hardhat Detection for Construction Safety Applications
BE Mneymneh, M Abbas, H Khoury
Procedia Engineering 196, 895-902, 2017
132017
Infrastructureless approach for ubiquitous user location tracking in construction environments
H Khoury, D Chdid, R Oueiss, I Elhajj, D Asmar
Automation in Construction 56, 47-66, 2015
132015
Assessing on-site construction personnel hazard perception in a Middle Eastern developing country: An interactive graphical approach
M Abbas, BE Mneymneh, H Khoury
Safety Science 103, 183-196, 2018
122018
Evaluation of computer vision techniques for automated hardhat detection in indoor construction safety applications
HK Bahaa Eddine MNEYMNEH,Mohamad ABBAS
Frontiers of Engineering Management, doi: 10.15302/J-FEM-2018071., 2018
12*2018
A simulator-based approach for modeling longitudinal driving behavior in construction work zones: Exploration and assessment
SH Hamdar, H Khoury, S Zehtabi
Simulation 92 (6), 579-594, 2016
122016
Structure of an extensible augmented reality framework for visualization of simulated construction processes
AH Behzadan, HM Khoury, VR Kamat
Proceedings of the 2006 Winter Simulation Conference, 2055-2062, 2006
112006
Vision-based framework for intelligent monitoring of hardhat wearing on construction sites
BE Mneymneh, M Abbas, H Khoury
Journal of Computing in Civil Engineering 33 (2), 04018066, 2019
82019
Indoor user localization for rapid information access and retrieval on construction sites
HM Khoury, VR Kamat
Proceedings of the 15th Workshop of Intelligent Computing in Engineering and …, 2008
82008
Particularized analysis of AIA’s expeditious mechanisms for administering claims and disputes
M Barakat, MA Abdul-Malak, H Khoury
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2018
72018
Sequencing and operational variations of standard claim and dispute resolution mechanisms
M Barakat, MA Abdul-Malak, H Khoury
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2019
52019
Progression Analysis of the EJCDC’s Underlying Claim and Dispute Resolution Mechanism
M Barakat, H Khoury, MA Abdul-Malak
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2018
52018
Sensor-Based Planning Tool for Tower Crane Anti-Collision Monitoring on Construction Sites
JP Sleiman, E Zankoul, H Khoury, F Hamzeh
Construction Research Congress 2016, 2624-2632, 2016
52016
The system can't perform the operation now. Try again later.
Articles 1–20