Robert Pellerin
Robert Pellerin
Verified email at polymtl.ca
Title
Cited by
Cited by
Year
The industrial management of SMEs in the era of Industry 4.0
A Moeuf, R Pellerin, S Lamouri, S Tamayo-Giraldo, R Barbaray
International Journal of Production Research 56 (3), 1118-1136, 2018
5092018
ERP implementation through critical success factors' management
O Françoise, M Bourgault, R Pellerin
Business process management journal, 2009
2462009
Manufacturing execution system–a literature review
B Saenz de Ugarte, A Artiba, R Pellerin
Production planning and control 20 (6), 525-539, 2009
2172009
Will Model-based Definition replace engineering drawings throughout the product lifecycle? A global perspective from aerospace industry
V Quintana, L Rivest, R Pellerin, F Venne, F Kheddouci
Computers in industry 61 (5), 497-508, 2010
2142010
Risk management applied to projects, programs, and portfolios
H Sanchez, B Robert, M Bourgault, R Pellerin
International journal of managing projects in Business, 2009
1422009
A project portfolio risk-opportunity identification framework
H Sanchez, B Robert, R Pellerin
Project Management Journal 39 (3), 97-109, 2008
1032008
Identification of critical success factors, risks and opportunities of Industry 4.0 in SMEs
A Moeuf, S Lamouri, R Pellerin, S Tamayo-Giraldo, E Tobon-Valencia, ...
International Journal of Production Research 58 (5), 1384-1400, 2020
872020
A process-based approach to operationalize life cycle assessment through the development of an eco-design decision-support system
V Poudelet, JA Chayer, M Margni, R Pellerin, R Samson
Journal of Cleaner Production 33, 192-201, 2012
772012
Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint
B Bouslah, A Gharbi, R Pellerin
Omega 61, 110-126, 2016
732016
Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system
B Bouslah, A Gharbi, R Pellerin
International Journal of Production Economics 144 (1), 143-156, 2013
722013
Strengths and weaknesses of small and medium sized enterprises regarding the implementation of lean manufacturing
A Moeuf, S Tamayo, S Lamouri, R Pellerin, A Lelievre
IFAC-PapersOnLine 49 (12), 71-76, 2016
692016
A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
R Pellerin, N Perrier, F Berthaut
European Journal of Operational Research 280 (2), 395-416, 2020
602020
Determinants of construction companies' use of web‐based interorganizational information systems
P Hadaya, R Pellerin
Supply Chain Management: An International Journal, 2010
532010
Impacts of Industry 4.0 technologies on Lean principles
F Rosin, P Forget, S Lamouri, R Pellerin
International Journal of Production Research 58 (6), 1644-1661, 2020
522020
Re-engineering the Engineering Change Management process for a drawing-less environment
V Quintana, L Rivest, R Pellerin, F Kheddouci
Computers in Industry 63 (1), 79-90, 2012
522012
The impact of contextual factors on ERP assimilation: Exploratory findings from a developed and a developing country
R Kouki, D Poulin, R Pellerin
Journal of global information technology management 13 (1), 28-55, 2010
502010
The impact of contextual factors on ERP assimilation: Exploratory findings from a developed and a developing country
R Kouki, D Poulin, R Pellerin
Journal of global information technology management 13 (1), 28-55, 2010
502010
A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations
N Perrier, B Agard, P Baptiste, JM Frayret, A Langevin, R Pellerin, ...
Computers & Operations Research 40 (7), 1895-1906, 2013
482013
Proposing a new framework and an innovative approach to teaching reengineering and ERP implementation concepts
R Pellerin, P Hadaya
Journal of Information Systems Education 19 (1), 65, 2008
472008
Production control and replenishment strategy with multiple suppliers
A Hajji, A Gharbi, JP Kenne, R Pellerin
European Journal of Operational Research 208 (1), 67-74, 2011
462011
The system can't perform the operation now. Try again later.
Articles 1–20