DaniŽl Telgen
DaniŽl Telgen
avans university of applied sciences
Verified email at avans.nl
Title
Cited by
Cited by
Year
Assessment of reconfiguration schemes for Reconfigurable Manufacturing Systems based on resources and lead time
E Puik, D Telgen, L van Moergestel, D Ceglarek
Robotics and Computer-Integrated Manufacturing 43, 30-38, 2017
372017
Decentralized autonomous-agent-based infrastructure for agile multiparallel manufacturing
L van Moergestel, E Puik, D Telgen, JJ Meyer
2011 Tenth International Symposium on Autonomous Decentralized Systems, 281-288, 2011
292011
Production scheduling in an agile agent-based production grid
L van Moergestel, E Puik, D Telgen, JJ Meyer
2012 IEEE/WIC/ACM International Conferences on Web Intelligence and†…, 2012
252012
Requirements and matching software technologies for sustainable and agile manufacturing systems
D Telgen, L van Moergestel, E Puik, P Muller, JJ Meyer
Intelli2013 proceedings, Venice, Italy, 30-35, 2013
152013
Implementing manufacturing as a service: A pull-driven agent-based manufacturing grid
L Moergestel, E Puik, D Telgen, JJC Meyer
Proceedings of the 11th International Conference on ICT in Education†…, 2015
142015
Structured analysis of reconfigurable manufacturing systems
E Puik, D Telgen, L van Moergestel, D Ceglarek
Advances in Sustainable and Competitive Manufacturing Systems, 147-157, 2013
142013
Agile manufacturing possibilities with agent technology
D Telgen, L Van Moergestel, E Puik, JJ Meyer
Flexible Automation and Intelligent Manufacturing, 2012
102012
Embedded autonomous agents in products supporting repair and recycling
L van Moergestel, E Puik, D Telgen, JJ Meyer
2013 IEEE Eleventh International Symposium on Autonomous Decentralized†…, 2013
92013
Monitoring Agents in Complex Products-Enhancing a Discovery Robot with an Agent for Monitoring, Maintenance and Disaster Prevention.
L van Moergestel, E Puik, D Telgen, H Folmer, M GrŁnbauer, R Proost, ...
ICAART (2), 5-13, 2013
92013
A simulation model for transport in a grid-based manufacturing system
L van Moergestel, E Puik, DH Telgen, M Kuijl, B Alblas, J Koelewijn, ...
Proc. of the Third International Conference on Intelligent Systems and†…, 2014
82014
Cost modelling for micro manufacturing logistics when using a grid of equiplets
E Puik, L van Moergestel, D Telgen
2011 IEEE International Symposium on Assembly and Manufacturing (ISAM), 1-4, 2011
82011
The role of agents in the lifecycle of a product
LJM Van Moergestel, JJC Meyer, E Puik, DH Telgen
CMD 2010 proceedings, 28-32, 2010
82010
Simulation of multiagent-based agile manufacturing
LJM van Moergestel, JJC Meyer, E Puik, DH Telgen
CMD 2010 proceedings, 23-27, 2010
82010
Automatic structured decomposition of manufacturing actions in an agent-based manufacturing system
D Telgen, L van Moergestel, E Puik, A van Zanten, A Abdulamir, JJ Meyer
2013 IEEE/WIC/ACM International Joint Conferences on Web Intelligence (WI†…, 2013
72013
Agents in domestic environments
L van Moergestel, W Langerak, G Meerstra, N van Nieuwenburg, F Pape, ...
2013 19th International Conference on Control Systems and Computer Science†…, 2013
72013
Agile product manufacturing by dynamically generating control instructions
D Telgen, L van Moergestel, E Puik, A van Zanten, A Abdulamir, JJ Meyer
2013 IEEE International Symposium on Assembly and Manufacturing (ISAM), 282-284, 2013
62013
Internet of Smart Things
L van Moergestel, M van den Berg, M Knol, R van der Paauw, ...
Proceedings of the 8th International Conference on Agents and Artificial†…, 2016
52016
Qualitative product/process modelling for reconfigurable manufacturing systems
E Puik, D Telgen, L van Moergeste, D Ceglarek
2013 IEEE International Symposium on Assembly and Manufacturing (ISAM), 214-218, 2013
52013
A versatile agile agent-based infrastructure for hybrid production environments
LJM van Moergestel, DH Telgen, E Puik, JJC Meyer
IFAC Proceedings Volumes 46 (9), 210-215, 2013
52013
Hierarchical management of a heterarchical manufacturing grid
D Telgen, L van Moergestel, E Puik, A Streng, R Scheefhals, T Bakker, ...
Proceedings of the 24th International Conference on Flexible Automation†…, 2014
42014
The system can't perform the operation now. Try again later.
Articles 1–20