Follow
Alireza Rahimi-Vahed
Alireza Rahimi-Vahed
Mechanical and Industrial Engineering Department, University of Toronto
Verified email at utoronto.ca
Title
Cited by
Cited by
Year
A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problem
A Rahimi-Vahed, AH Mirzaei
Computers & Industrial Engineering 53 (4), 642-666, 2007
2602007
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness
R Tavakkoli-Moghaddam, A Rahimi-Vahed, AH Mirzaei
Information Sciences 177 (22), 5072-5090, 2007
1942007
A multi-objective scatter search for a dynamic cell formation problem
MA Bajestani, M Rabbani, AR Rahimi-Vahed, GB Khoshkhou
Computers & operations research 36 (3), 777-794, 2009
1512009
A multi-objective scatter search for a mixed-model assembly line sequencing problem
AR Rahimi-Vahed, M Rabbani, R Tavakkoli-Moghaddam, SA Torabi, ...
Advanced Engineering Informatics 21 (1), 85-99, 2007
1432007
Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
A Rahimi-Vahed, AH Mirzaei
Soft Computing 12, 435-452, 2008
1362008
A multi-objective particle swarm for a flow shop scheduling problem
AR Rahimi-Vahed, SM Mirghorbani
Journal of combinatorial optimization 13, 79-102, 2007
1102007
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
R Tavakkoli-Moghaddam, AR Rahimi-Vahed
Applied Mathematics and Computation 181 (2), 1471-1481, 2006
1092006
A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem
A Rahimi-Vahed, M Dangchi, H Rafiei, E Salimi
The International Journal of Advanced Manufacturing Technology 41, 1227-1239, 2009
982009
A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system
K Rafiee, M Rabbani, H Rafiei, A Rahimi-Vahed
Applied Mathematical Modelling 35 (4), 1810-1819, 2011
812011
Fleet-sizing for multi-depot and periodic vehicle routing problems using a modular heuristic algorithm
A Rahimi-Vahed, TG Crainic, M Gendreau, W Rei
Computers & Operations Research 53, 9-23, 2015
752015
A path relinking algorithm for a multi-depot periodic vehicle routing problem
A Rahimi-Vahed, TG Crainic, M Gendreau, W Rei
Journal of heuristics 19, 497-524, 2013
722013
Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm
R Tavakkoli-Moghaddam, AR Rahimi-Vahed, AH Mirzaei
The International Journal of Advanced Manufacturing Technology 36, 969-981, 2008
642008
A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem
AR Rahimi-Vahed, SM Mirghorbani, M Rabbani
Soft computing 11, 997-1012, 2007
632007
A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
AR Rahimi-Vahed, B Javadi, M Rabbani, R Tavakkoli-Moghaddam
Engineering Optimization 40 (4), 331-346, 2008
622008
Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem
MD Mahdi Mobini, M Rabbani, MS Amalnik, J Razmi, AR Rahimi-Vahed
Soft Computing 13, 597-610, 2009
562009
A simulated annealing method for solving a new mathematical model of a multi-criteria cell formation problem with capital constraints
R Tavakkoli-Moghaddam, AR Rahimi-Vahed, A Ghodratnama, A Siadat
Advances in Engineering Software 40 (4), 268-273, 2009
432009
A hybrid multi-objective particle swarm algorithm for a mixed-model assembly line sequencing problem
AR Rahimi-Vahed, SM Mirghorbani, M Rabbani
Engineering Optimization 39 (8), 877-898, 2007
382007
Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
B Javadi, A Rahimi-Vahed, M Rabbani, M Dangchi
The International Journal of Advanced Manufacturing Technology 39, 975-982, 2008
272008
Solving a bi-criteria permutation flow shop problem using immune algorithm
R Tavakkoli-Moghaddam, AR Rahimi-Vahed, AH Mirzaei
2007 IEEE Symposium on Computational Intelligence in Scheduling, 49-56, 2007
192007
Real options approach for a mixed-model assembly line sequencing problem
M Rabbani, A Rahimi-Vahed, SA Torabi
The International Journal of Advanced Manufacturing Technology 37, 1209-1219, 2008
162008
The system can't perform the operation now. Try again later.
Articles 1–20