Follow
Ghiath Al Aqel
Ghiath Al Aqel
Hubei University of Technology
Verified email at hbut.edu.cn
Title
Cited by
Cited by
Year
A modified iterated greedy algorithm for flexible job shop scheduling problem
G Al Aqel, X Li, L Gao
Chinese Journal of Mechanical Engineering 32 (1), 21, 2019
402019
Prediction of tubular T/Y-joint SIF by GA-BP neural network
X Li, S Dong, HS Mohamed, G Al Aqel, N Pirhadi
KSCE Journal of Civil Engineering 24, 2706-2715, 2020
182020
A priority-based heuristic algorithm (PBHA) for optimizing integrated process planning and scheduling problem
MF Ausaf, L Gao, X Li, G Al Aqel
Cogent Engineering 2 (1), 1070494, 2015
172015
Using iterated greedy with a new population approach for the flexible jobshop scheduling problem
G Al Aqel, X Li, L Gao, W Gong, R Wang, T Ren, G Wu
2018 IEEE International Conference on Industrial Engineering and Engineering …, 2018
52018
A New Priority-Sort Based Optimization Algorithm for Integrated Process Planning and Scheduling
G Al Aqel, MF Ausaf, X Li, L Gao
International Journal of Modeling and Optimization 3 (2), 226, 2013
42013
The system can't perform the operation now. Try again later.
Articles 1–5