Follow
Amin Alinezhad Esboei
Amin Alinezhad Esboei
Department of Management and Industrial Engineering, MUT, Tehran
Verified email at uast.ac.ir - Homepage
Title
Cited by
Cited by
Year
Augmented ε-constraint method in multiobjective staff scheduling problem: a case study
SJ Sadjadi, M Heidari, A Alinezhad Esboei
The International Journal of Advanced Manufacturing Technology, 1-10, 2013
262013
Using a fuzzy expert system as a decision support system to decrease time consumption in the UAST development process: A case study
A Alinezhad Esboei, MH Karimi Gavareshki
Iranian Journal of Fuzzy Systems 18 (3), 27-38, 2021
42021
A Multi-Objective Programming to Increase Labor Efficiency of a Truck Hub: A Case Study
SJ Sadjadi, A Alinezhad Esboei
International Journal of Industrial Engineering 23 (2), 155-162, 2012
12012
The system can't perform the operation now. Try again later.
Articles 1–3