Follow
Farzad Amirkhani
Farzad Amirkhani
PHD student, Shahed University
Verified email at shahed.ac.ir
Title
Cited by
Cited by
Year
Estimating total and specific process capability indices in three-stage processes with measurement errors
E Nikzad, A Amiri, F Amirkhani
Journal of Statistical Computation and Simulation 88 (15), 3033-3064, 2018
222018
A novel framework for spatiotemporal monitoring and post‐signal diagnosis of processes with image data
F Amirkhani, A Amiri
Quality and Reliability Engineering International 36 (2), 705-735, 2020
102020
A risk-adjusted EWMA chart with dynamic probability control limits for monitoring survival time
E Tighkhorshid, A Amiri, F Amirkhani
Communications in Statistics-Simulation and Computation 51 (3), 1333-1354, 2020
92020
A New Method Based On Simulation-Optimization Approach to Find Optimal Solution in Dynamic Jobshop Scheduling Problem with Breakdown and Rework (In Farsi)
F Amirkhani, A Amiri, R Sahraeian
To appear in Journal of Prodution and Operations Management, 2015
32015
A self-starting Risk-adjusted AFT-based control chart for monitoring the survival time of patients
E Tighkhorshid, A Amiri, F Amirkhani
1*2018
بررسي اثر تخمين پارامتر در پروفايلهاي خطي چندمتغيره با خودهمبستگي درون پروفايلي
M Shahmansouri, A Amiri, F Amirkhani
شانزدهمين کنفرانس بين المللي مهندسي صنايع, 2020
2020
An Integrated Model of Statistical Process Control and Maintenance Based on Delayed Monitoring in Two-Stage Processes (in Farsi)
SS Najibi, A Amiri, F Amirkhani
To appear in Journal of Industrial Engineering & Management, 2019
2019
نمودار کنترلي ريسک تعديلشدهي مبتني بر باقيماندهي استاندارد رگرسيون شکست تسريع يافته براي پايش زمان بقاي بيماران جراحي قلب با در نظر گرفتن گروههاي جراحان
E Tighkhorshid, A Amiri, F Amirkhani
پانزدهمين کنفرانس بين المللي مهندسي صنايع, 2019
2019
نمودار کنترل مبتني بر پي-مقدار تحليل واريانس يکطرفه براي پايش زماني دادههاي تصويري داراي الگو
F Amirkhani, A Amiri
چهاردمين کنفرانس بين المللي مهندسي صنايع، تهران، ايران., 2018
2018
Integrating Simulation and Optimization to Schedule a Dynamic Job shop problem
F Amirkhani, R Sahraeian
9th International Industrial Engineering Conference, 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–10