Measuring parameters of lean manufacturing realization G Chauhan, TP Singh Measuring Business Excellence 16 (3), 57-71, 2012 | 207 | 2012 |
Production of AMC by stir casting–an overview P Sharma, G Chauhan, N Sharma International Journal of Contemporary Practices 2 (1), 23-46, 2011 | 94 | 2011 |
Resource flexibility for lean manufacturing: SAP-LAP analysis of a case study G Chauhan, TP Singh International Journal of Lean Six Sigma 4 (4), 370-388, 2013 | 41 | 2013 |
A phase-wise approach to implement lean manufacturing G Chauhan, V Chauhan International Journal of Lean Six Sigma 10 (1), 106-122, 2019 | 37 | 2019 |
An analysis of the status of resource flexibility and lean manufacturing in a textile machinery manufacturing company G Chauhan International Journal of Organizational Analysis 24 (1), 107-122, 2016 | 34 | 2016 |
Development and validation of resource flexibility measures for manufacturing industry G Chauhan, TP Singh Journal of Industrial Engineering and Management 7 (1), 21-41, 2014 | 34 | 2014 |
Lean manufacturing through management of labor and machine flexibility: A comprehensive review G Chauhan, TP Singh Global Journal of Flexible Systems Management 12, 59-80, 2011 | 26 | 2011 |
Significant parameters of labour flexibility contributing to lean manufacturing TP Singh, G Chauhan Global Journal of Flexible Systems Management 14, 93-105, 2013 | 17 | 2013 |
Cost reduction through lean manufacturing: a case study G Chauhan, T P Singh, S K Sharma International Journal of Industrial Engineering Practice 1 (1), 1-8, 2009 | 13 | 2009 |
Measuring the Status of Lean Manufacturing using AHP G Chauhan, TP Singh, SK Sharma International Journal on Emerging Technologies 1 (2), 115-120, 2010 | 12* | 2010 |
Role of machine flexibility in lean manufacturing G Chauhan, T P Singh, S K Sharma International Journal of Applied Engineering Research 4 (1), 25-33, 2009 | 10 | 2009 |
Change processes towards flexible lean manufacturing: a framework G Chauhan, TP Singh, SK Sharma International Journal of Performability Engineering 6 (4), 363-372, 2010 | 6 | 2010 |
Advance industrial approach for waste reduction: Lean Manufacturing V Chahal, S Sharma, G Chauhan International Journal of Emerging Technology and Advanced Engineering 3 (11 …, 2013 | 5 | 2013 |
PRODUCTION OF AMC BY STIR CASTING-AN OVERVIEW NS Gulshan Chauhan PradeepSharma International Journal of Contemporary Practises 2, 2008 | 5* | 2008 |
Data-driven prioritization of performance variables for flexible manufacturing systems: revealing key metrics with the best–worst method A Bagherian, G Chauhan, AL Srivastav The International Journal of Advanced Manufacturing Technology 130 (5), 3081 …, 2024 | 1 | 2024 |
Significant parameters of machine flexibility contributing to lean manufacturing G Chauhan International Journal of Emerging Research in Management and Technology 6 …, 2017 | 1* | 2017 |
Correction to: Data‑driven prioritization of performance variables for flexible manufacturing systems: revealing key metrics with the best–worst method A Bagherian, G Chauhan, AL Srivastav The International Journal of Advanced Manufacturing Technology, 1-1, 2024 | | 2024 |
Evaluating the Ranking of Performance Variables in Flexible Manufacturing System through the Best-Worst Method A Bagherian, G Chauhan, AL Srivastav, R Kumar Sharma Designs 8 (1), 12, 2024 | | 2024 |
Steam conservation study of sugar industry G Chauhan, V Mohd International Journal of Mechanical and Production Engineering Research and …, 2019 | | 2019 |
Optimization of railway container yard V Mohd, G Chauhan, S Mishra International Journal of Mechanical and Production Engineering Research and …, 2019 | | 2019 |