Utilization of coal mixed waste aggregates available at thermal power plants for GSB and asphalt mixtures Y Pandey, V Tare Procedia engineering 143, 170-177, 2016 | 13 | 2016 |
Study of concrete properties using rice husk ash and marble powder P Raikwar, V Tare International journal of emerging technology and advanced engineering 4 (8 …, 2014 | 13 | 2014 |
Assessment of pedestrian level of service for mixed lane AK Raghuwanshi, V Tare Research Journal of Engineering and Technology 7 (1), 11-14, 2016 | 6 | 2016 |
PaVemenT deTerIoraTIon modelIng for loW Volume roads V TARE, HS Goliya, A BHATORE, K MESHRAM Journal of The IndIan roads Congress Volume 73-4, 67, 2013 | 3 | 2013 |
Impact of road rationing on modal shift and transport sustainability in Delhi, India Minal, KK Gajrani, CR Sekhar, V Tare Proceedings of the Institution of Civil Engineers-Transport 175 (1), 12-21, 2022 | 2 | 2022 |
Performance models for rural roads A Bhatore, V Tare Indian Highways 42 (2), 2014 | 2 | 2014 |
Optimization of transfer time and initial waiting time for a bus network using genetic algorithm V TARE, K MESHRAM, S SRIVASTAVA INDIAN HIGHWAYS, 48, 2014 | 1 | 2014 |
Overlay Alternatives on Flexible Pavements-A Case Study V Tare, KM Nrupesh Indian Highways 34 (12), 41, 2006 | 1 | 2006 |
Effect of plastic waste particle size on the performance of asphalt concrete V Shrivastava, V Tare | | 2022 |
Performance Evaluation of Super-Pave and Marshall Mix Design to Suite Indian Climatic and Traffic Conditions H Kumar, V Tare Highway Research Journal 9 (1), 2018 | | 2018 |
Cost Effective Measures for Rehabilitation and Upgradation of Existing Single Lane Road to Multilane Standard Under Engineering Procurement and Construction (EPC) Module B Kumar, V Tare Indian Highways 45 (12), 2017 | | 2017 |
Preservation and Service Life Extension of Periodical Renewals Provided under Improvement of Riding Quality Program (IRQP) B Kumar, V Tare Indian Highways 43 (11), 2015 | | 2015 |
New technology for road construction and maintenance Y Pandey, V Tare, A Jain, A Shishodia NISCAIR-CSIR, India, 2015 | | 2015 |
Design of high embankments for high speed track near Pithampur situated at Malwa Platue HS Goliya, H Mahiyar, V Tare Indian Highways 42 (5), 2014 | | 2014 |
Distresses in concrete pavement: a case study of Indore Byepass V Tare, A Asati Indian Highways 42 (1), 2014 | | 2014 |
EVALUATION OF URBAN NETWORK: A CASE STUDY OF INDORE CITY. V TARE, OP Bhatia Indian Highways, 2004 | | 2004 |
Development of Travel Time-Flow Model for Corridors Under Heterogeneous Traffic DK Parbat, V Tare, OP Bhatia Indian Highways 30 (12), 2002 | | 2002 |
Development of OD Time-Distance Plot and Isochron Map for Indore City DK Parbat, V Tare, OP Bhatia Indian Highways 29 (9), 2001 | | 2001 |
DEVELOPMENT OF TRIP MATRICES AND DESIRE LINE CHART FOR INDORE CITY. V TARE, OP Bhatia, SL Dhingra Indian Highways, 1996 | | 1996 |
A framework for the evaluation of alternative traffic management scheme for metropolitan city in a developing country V Tare, OP BHATIA, SL Dhingra Indian Highways 22 (11), 1994 | | 1994 |