Follow
Vandana Tare
Vandana Tare
Professor for civil engineering, shri GS institute of technology and science Indore M P
Verified email at sgsits.ac.in
Title
Cited by
Cited by
Year
Utilization of coal mixed waste aggregates available at thermal power plants for GSB and asphalt mixtures
Y Pandey, V Tare
Procedia engineering 143, 170-177, 2016
132016
Study of concrete properties using rice husk ash and marble powder
P Raikwar, V Tare
International journal of emerging technology and advanced engineering 4 (8 …, 2014
132014
Assessment of pedestrian level of service for mixed lane
AK Raghuwanshi, V Tare
Research Journal of Engineering and Technology 7 (1), 11-14, 2016
62016
PaVemenT deTerIoraTIon modelIng for loW Volume roads
V TARE, HS Goliya, A BHATORE, K MESHRAM
Journal of The IndIan roads Congress Volume 73-4, 67, 2013
32013
Impact of road rationing on modal shift and transport sustainability in Delhi, India
Minal, KK Gajrani, CR Sekhar, V Tare
Proceedings of the Institution of Civil Engineers-Transport 175 (1), 12-21, 2022
22022
Performance models for rural roads
A Bhatore, V Tare
Indian Highways 42 (2), 2014
22014
Optimization of transfer time and initial waiting time for a bus network using genetic algorithm
V TARE, K MESHRAM, S SRIVASTAVA
INDIAN HIGHWAYS, 48, 2014
12014
Overlay Alternatives on Flexible Pavements-A Case Study
V Tare, KM Nrupesh
Indian Highways 34 (12), 41, 2006
12006
Effect of plastic waste particle size on the performance of asphalt concrete
V Shrivastava, V Tare
2022
Performance Evaluation of Super-Pave and Marshall Mix Design to Suite Indian Climatic and Traffic Conditions
H Kumar, V Tare
Highway Research Journal 9 (1), 2018
2018
Cost Effective Measures for Rehabilitation and Upgradation of Existing Single Lane Road to Multilane Standard Under Engineering Procurement and Construction (EPC) Module
B Kumar, V Tare
Indian Highways 45 (12), 2017
2017
Preservation and Service Life Extension of Periodical Renewals Provided under Improvement of Riding Quality Program (IRQP)
B Kumar, V Tare
Indian Highways 43 (11), 2015
2015
New technology for road construction and maintenance
Y Pandey, V Tare, A Jain, A Shishodia
NISCAIR-CSIR, India, 2015
2015
Design of high embankments for high speed track near Pithampur situated at Malwa Platue
HS Goliya, H Mahiyar, V Tare
Indian Highways 42 (5), 2014
2014
Distresses in concrete pavement: a case study of Indore Byepass
V Tare, A Asati
Indian Highways 42 (1), 2014
2014
EVALUATION OF URBAN NETWORK: A CASE STUDY OF INDORE CITY.
V TARE, OP Bhatia
Indian Highways, 2004
2004
Development of Travel Time-Flow Model for Corridors Under Heterogeneous Traffic
DK Parbat, V Tare, OP Bhatia
Indian Highways 30 (12), 2002
2002
Development of OD Time-Distance Plot and Isochron Map for Indore City
DK Parbat, V Tare, OP Bhatia
Indian Highways 29 (9), 2001
2001
DEVELOPMENT OF TRIP MATRICES AND DESIRE LINE CHART FOR INDORE CITY.
V TARE, OP Bhatia, SL Dhingra
Indian Highways, 1996
1996
A framework for the evaluation of alternative traffic management scheme for metropolitan city in a developing country
V Tare, OP BHATIA, SL Dhingra
Indian Highways 22 (11), 1994
1994
The system can't perform the operation now. Try again later.
Articles 1–20