Iver Bakken Sperstad
TitleCited byYear
Reference Cases for Verification of Operation and Maintenance Simulation Models for Offshore Wind Farms
I Dinwoodie, OEV Endrerud, M Hofmann, R Martin, IB Sperstad
Wind Engineering 39 (1), 1-14, 2015
842015
Quantum transport in ballistic s±-wave superconductors with interband coupling: Conductance spectra, crossed Andreev reflection, and Josephson current
IB Sperstad, J Linder, A Sudbø
Physical Review B 80 (14), 144507, 2009
752009
Nowicob–a tool for reducing the maintenance costs of offshore wind farms
M Hofmann, IB Sperstad
Energy Procedia 35, 177-186, 2013
712013
Optimisation of maintenance routing and scheduling for offshore wind farms
CA Irawan, D Ouelhadj, D Jones, M Stålhane, IB Sperstad
European Journal of Operational Research 256 (1), 76-89, 2017
622017
0-π phase shifts in Josephson junctions as a signature for the s±-wave pairing state
J Linder, IB Sperstad, A Sudbø
Physical Review B 80 (2), 020503, 2009
542009
Josephson current in diffusive multilayer superconductor/ferromagnet/superconductor junctions
IB Sperstad, J Linder, A Sudbø
Physical Review B 78 (10), 104509, 2008
502008
Coexistence of itinerant ferromagnetism and a nonunitary superconducting state with line nodes: Possible application to UGe 2
J Linder, IB Sperstad, AH Nevidomskyy, M Cuoco, A Sudbø
Physical Review B 77 (18), 184511, 2008
242008
Will 10 MW wind turbines bring down the operation and maintenance cost of offshore wind farms?
M Hofmann, IB Sperstad
Energy Procedia 53, 231-238, 2014
232014
A Comparison of Single-and Multi-parameter Wave Criteria for Accessing Wind Turbines in Strategic Maintenance and Logistics Models for Offshore Wind Farms
IB Sperstad, EE Halvorsen-Weare, M Hofmann, LM Nonås, M Stålhane, ...
Energy Procedia 53, 221-230, 2014
192014
Testing the robustness of optimal access vessel fleet selection for operation and maintenance of offshore wind farms
IB Sperstad, M Stålhane, I Dinwoodie, OEV Endrerud, R Martin, E Warner
Ocean Engineering 145, 334–343, 2017
162017
Cost-benefit evaluation of remote inspection of offshore wind farms by simulating the operation and maintenance phase
Ø Netland, IB Sperstad, M Hofmann, A Skavhaug
Energy Procedia 53, 239-247, 2014
162014
Energy Storage Scheduling in Distribution Systems Considering Wind and Photovoltaic Generation Uncertainties
IB Sperstad, M Korpås
Energies 12 (7), 1231, 2019
152019
Three distinct types of quantum phase transitions in a (2+ 1)-dimensional array of dissipative Josephson junctions
EB Stiansen, IB Sperstad, A Sudbø
Physical Review B 85 (22), 224531, 2012
152012
Investigating key decision problems to optimise the operation and maintenance strategy of offshore wind farms
IB Sperstad, FD McAuliffe, M Kolstad, S Sjømark
Energy Procedia 94, 261–268, 2016
132016
Monte Carlo simulations of dissipative quantum Ising models
IB Sperstad, EB Stiansen, A Sudbø
Physical Review B 81 (10), 104302, 2010
132010
Quantum criticality in spin chains with non-Ohmic dissipation
IB Sperstad, EB Stiansen, A Sudbø
Physical Review B 85 (21), 214302, 2012
112012
IEA Wind Task 26 Offshore Wind Farm Baseline Documentation
G Smart, A Smith, E Warner, IB Sperstad, B Prinsen, R Lacal-Arantegui
NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)), 2016
102016
Interruption costs and time dependencies in quality of supply regulation
GH Kjølle, IB Sperstad, SH Jakobsen
Probabilistic Methods Applied to Power Systems (PMAPS), 2014 International …, 2014
92014
Quantum criticality in a dissipative (2+ 1)-dimensional X Y model of circulating currents in high-T c cuprates
IB Sperstad, EB Stiansen, A Sudbø
Physical Review B 84 (18), 180503, 2011
82011
Integration of Degradation Processes in a Strategic Offshore Wind Farm O&M Simulation Model
TM Welte, IB Sperstad, EH Sørum, ML Kolstad
Energies 10, 925, 2017
62017
The system can't perform the operation now. Try again later.
Articles 1–20