Mohamed Al-Hussein
Mohamed Al-Hussein
Professor
Verified email at ualberta.ca
TitleCited byYear
Development of lean model for house construction using value stream mapping
H Yu, T Tweed, M Al-Hussein, R Nasseri
Journal of construction engineering and management 135 (8), 782-790, 2009
1452009
Integrating 3D visualization and simulation for tower crane operations on construction sites
M Al-Hussein, MA Niaz, H Yu, H Kim
Automation in Construction 15 (5), 554-562, 2006
1402006
Optimization algorithm for selection and on site location of mobile cranes
M Al-Hussein, S Alkass, O Moselhi
Journal of construction engineering and management 131 (5), 579-590, 2005
1012005
Lean transformation in a modular building company: A case for implementation
H Yu, M Al-Hussein, S Al-Jibouri, A Telyas
Journal of management in engineering 29 (1), 103-111, 2011
812011
BIM-based integrated approach for detailed construction scheduling under resource constraints
H Liu, M Al-Hussein, M Lu
Automation in Construction 53, 29-43, 2015
732015
Automated post-simulation visualization of modular building production assembly line
SH Han, M Al-Hussein, S Al-Jibouri, H Yu
Automation in construction 21, 229-236, 2012
552012
Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation
HX Li, M Al-Hussein, Z Lei, Z Ajweh
Canadian Journal of Civil Engineering 40 (12), 1184-1195, 2013
532013
A methodology for mobile crane lift path checking in heavy industrial projects
Z Lei, H Taghaddos, U Hermann, M Al-Hussein
Automation in Construction 31, 41-53, 2013
522013
Monitoring building energy consumption, thermal performance, and indoor air quality in a cold climate region
T Sharmin, M Gül, X Li, V Ganev, I Nikolaidis, M Al-Hussein
Sustainable Cities and Society 13, 57-68, 2014
512014
An algorithm for mobile crane selection and location on construction sites
M Al-Hussein, S Alkass, O Moselhi
Construction Innovation 1 (2), 91-105, 2001
482001
An automated biomechanical simulation approach to ergonomic job analysis for workplace design
A Golabchi, SH Han, JO Seo, SU Han, SH Lee, M Al-Hussein
Journal of Construction Engineering and Management 141 (8), 04015020, 2015
402015
Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects
S Hasan, A Bouferguene, M Al-Hussein, P Gillis, A Telyas
Automation in Construction 31, 255-264, 2013
352013
Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry
H Liu, M Lu, M Al-Hussein
Advanced Engineering Informatics 30 (2), 190-207, 2016
342016
Artificial neural network model for cost estimation: City of Edmonton’s water and sewer installation services
DP Alex, M Al Hussein, A Bouferguene, S Fernando
Journal of Construction Engineering and Management 136 (7), 745-756, 2009
342009
Simulation-based scheduling of module assembly yards: Case study
Y Mohamed, D Borrego, L Francisco, M Al-Hussein, S AbouRizk, ...
Engineering, Construction and Architectural Management 14 (3), 293-311, 2007
342007
Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation
JD Manrique, M Al-Hussein, A Telyas, G Funston
Journal of construction engineering and management 133 (3), 199-207, 2007
342007
Survey of information technology applications in construction
W El-Ghandour, M Al-Hussein
Construction innovation 4 (2), 83-98, 2004
342004
Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews
A Agbulos, Y Mohamed, M Al-Hussein, S AbouRizk, J Roesch
Journal of Construction Engineering and Management 132 (3), 291-299, 2006
332006
Ergonomic analysis and the need for its integration for planning and assessing construction tasks
N Inyang, M Al-Hussein, M El-Rich, S Al-Jibouri
Journal of Construction Engineering and Management 138 (12), 1370-1376, 2012
292012
Evolution of the crane selection and on-site utilization process for modular construction multilifts
J Olearczyk, M Al-Hussein, A Bouferguène
Automation in construction 43, 59-72, 2014
282014
The system can't perform the operation now. Try again later.
Articles 1–20