Maliheh Aramon
Title
Cited by
Cited by
Year
A multi-objective scatter search for a dynamic cell formation problem
MA Bajestani, M Rabbani, AR Rahimi-Vahed, GB Khoshkhou
Computers & operations research 36 (3), 777-794, 2009
1342009
Physics-inspired optimization for quadratic unconstrained problems using a digital annealer
M Aramon, G Rosenberg, E Valiante, T Miyazawa, H Tamura, ...
Frontiers in Physics 7, 48, 2019
1282019
A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem
SA Torabi, N Sahebjamnia, SA Mansouri, MA Bajestani
Applied Soft Computing 13 (12), 4750-4762, 2013
1092013
Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions
M Aramon Bajestani, D Banjevic, JC Beck
International Journal of Production Research 52 (24), 7377-7400, 2014
562014
Scheduling a dynamic aircraft repair shop with limited repair resources
MA Bajestani, JC Beck
Journal of Artificial Intelligence Research 47, 35-70, 2013
242013
Enhancing quantum annealing performance for the molecular similarity problem
M Hernandez, M Aramon
Quantum Information Processing 16 (5), 133, 2017
232017
A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
MA Bajestani, JC Beck
Journal of Scheduling 18 (5), 471-486, 2015
172015
An integrated GA-time series algorithm for forecasting oil production estimation: USA, Russia, India, and Brazil
A Azadeh, M Aramoon, M Saberi
International Journal of Industrial and Systems Engineering 4 (4), 368-387, 2009
172009
A novel graph-based approach for determining molecular similarity
M Hernandez, A Zaribafiyan, M Aramon, M Naghibi
arXiv preprint arXiv:1601.06693, 2016
162016
Integrating maintenance planning and production scheduling: Making operational decisions with a strategic perspective
MA Bajestani
University of Toronto, 2014
162014
Calendar-based age replacement policy with dependent renewal cycles
MA Bajestani, D Banjevic
IIE Transactions 48 (11), 1016-1026, 2016
142016
Scheduling an aircraft repair shop
MA Bajestani, JC Beck
Twenty-First International Conference on Automated Planning and Scheduling, 2011
132011
Physics-inspired optimization for constraint-satisfaction problems using a digital annealer
M Aramon, G Rosenberg, T Miyazawa, H Tamura, HG Katzgraber
arXiv preprint arXiv:1806.08815, 2018
52018
A novel graph-based approach for determining molecular similarity (2016)
M Hernandez, A Zaribafiyan, M Aramon, M Naghibi
arXiv preprint arXiv:1601.06693, 0
5
A new branch-and-bound algorithm for the unrelated parallel machine scheduling problem with sequence-dependent setup times
MA Bajestani, R Tavakkoli-Moghaddam
IFAC Proceedings Volumes 42 (4), 792-797, 2009
42009
Scheduling a dynamic aircraft repair shop
M Aramon Bajestani, JC Beck
Proceedings of the ICAPS2011 Workshop on Scheduling and Planning Applications, 2011
32011
Effects of setting temperatures in the parallel tempering Monte Carlo algorithm
I Rozada, M Aramon, J Machta, HG Katzgraber
Physical Review E 100 (4), 043311, 2019
22019
Maintenance resource planning for utility poles in a power distribution network
MA Bajestani, N Montgomery, D Banjevic, AKS Jardine
2015 Annual Reliability and Maintainability Symposium (RAMS), 1-6, 2015
22015
Chook--A comprehensive suite for generating binary optimization problems with planted solutions
D Perera, I Akpabio, F Hamze, S Mandra, N Rose, M Aramon, ...
arXiv preprint arXiv:2005.14344, 2020
12020
A feasibility pump algorithm embedded in an annealing framework
N Pradignac, M Aramon, HG Katzgraber
arXiv preprint arXiv:1906.06434, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–20