Carlos H. Caldas, Ph.D., P.E.
TitleCited byYear
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
J Song, CT Haas, C Caldas, E Ergen, B Akinci
Automation in construction 15 (2), 166-177, 2006
2922006
Measuring the impact of rework on construction cost performance
BG Hwang, SR Thomas, CT Haas, CH Caldas
Journal of construction engineering and management 135 (3), 187-198, 2009
2612009
Soil–water characteristic curve variability
CE Zapata, WN Houston, SL Houston, KD Walsh
Advances in unsaturated geotechnics, 84-124, 2000
209*2000
Tracking the location of materials on construction job sites
J Song, CT Haas, CH Caldas
Journal of Construction Engineering and Management 132 (9), 911-918, 2006
2002006
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
J Teizer, CH Caldas, CT Haas
Journal of Construction Engineering and Management 133 (11), 880-888, 2007
1832007
Automating hierarchical document classification for construction management information systems
CH Caldas, L Soibelman
Automation in Construction 12 (4), 395-406, 2003
1672003
Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities
DB Costa, CT Formoso, M Kagioglou, LF Alarcón, CH Caldas
Journal of Management in Engineering 22 (4), 158-167, 2006
1542006
Methodology for automating the identification and localization of construction components on industrial projects
DG Torrent, CH Caldas
Journal of Computing in Civil Engineering 23 (1), 3-13, 2009
1502009
A proximity-based method for locating RFID tagged objects
J Song, CT Haas, CH Caldas
Advanced Engineering Informatics 21 (4), 367-376, 2007
1402007
Automated classification of construction project documents
CH Caldas, L Soibelman, J Han
Journal of Computing in Civil Engineering 16 (4), 234-243, 2002
1352002
Automated object identification using optical video cameras on construction sites
S Chi, CH Caldas
Computer‐Aided Civil and Infrastructure Engineering 26 (5), 368-380, 2011
1332011
Assessing the impact of materials tracking technologies on construction craft productivity
D Grau, CH Caldas, CT Haas, PM Goodrum, J Gong
Automation in Construction 18 (7), 903-911, 2009
1252009
Computer vision-based video interpretation model for automated productivity analysis of construction operations
J Gong, CH Caldas
Journal of Computing in Civil Engineering 24 (3), 252-263, 2009
1222009
An object recognition, tracking, and contextual reasoning-based video interpretation method for rapid productivity analysis of construction operations
J Gong, CH Caldas
Automation in Construction 20 (8), 1211-1226, 2011
1072011
Using global positioning system to improve materials-locating processes on industrial projects
CH Caldas, DG Torrent, CT Haas
Journal of Construction Engineering and Management 132 (7), 741-749, 2006
1042006
Methodology for the integration of project documents in model-based information systems
CH Caldas, L Soibelman, L Gasser
Journal of Computing in Civil Engineering 19 (1), 25-33, 2005
1032005
Management and analysis of unstructured construction data types
L Soibelman, J Wu, C Caldas, I Brilakis, KY Lin
Advanced Engineering Informatics 22 (1), 15-27, 2008
872008
Activity analysis for direct-work rate improvement in construction
MC Gouett, CT Haas, PM Goodrum, CH Caldas
Journal of Construction Engineering and Management 137 (12), 1117-1124, 2011
802011
Image-based safety assessment: automated spatial safety risk identification of earthmoving and surface mining activities
S Chi, CH Caldas
Journal of Construction Engineering and Management 138 (3), 341-351, 2011
762011
Data processing for real-time construction site spatial modeling
J Gong, CH Caldas
Automation in Construction 17 (5), 526-535, 2008
752008
The system can't perform the operation now. Try again later.
Articles 1–20