Follow
Hadi Mokhtari
Hadi Mokhtari
Associate Professor of Industrial Engineering, University of Kashan
Verified email at kashanu.ac.ir - Homepage
Title
Cited by
Cited by
Year
An energy-efficient multi-objective optimization for flexible job-shop scheduling problem
H Mokhtari, A Hasani
Computers & Chemical Engineering 104, 339-352, 2017
2382017
A multi-objective optimization approach for green and resilient supply chain network design: a real-life case study
A Hasani, H Mokhtari, M Fattahi
Journal of cleaner production 278, 123199, 2021
1422021
Aggregate Production Planning: A Literature Review and Future Research Directions
A Cheraghalikhani, F Khoshalhan, H Mokhtari
International Journal of Industrial Engineering Computations, 2019
932019
Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate
H Mokhtari, M Dadgar
Computers & Operations Research 61, 31–45, 2015
812015
Application of geographically weighted regression model to analysis of spatiotemporal varying relationships between groundwater quantity and land use changes (case study …
S Taghipour Javi, B Malekmohammadi, H Mokhtari
Environmental monitoring and assessment 186, 3123-3138, 2014
682014
Time-cost tradeoff analysis in project management: an ant system approach
H Mokhtari, R Baradaran Kazemzadeh, A Salmasnia
IEEE Transactions on Engineering Management 58 (1), 36-43, 2011
602011
A multi-objective model for cleaner production-transportation planning in manufacturing plants via fuzzy goal programming
H Mokhtari, A Hasani
Journal of Manufacturing Systems 44 (Part 1), 230-242, 2017
582017
A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services
H Mokhtari, A Mozdgir, INK Abadi
International Journal of Production Research 50 (20), 5906-5925, 2012
552012
Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation
A Aghaie, H Mokhtari
The International Journal of Advanced Manufacturing Technology 45, 1051-1067, 2009
552009
A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resources
H Mokhtari, INK Abadi, A Cheraghalikhani
International Journal of Production Research 49 (19), 5851-5875, 2011
532011
Project time–cost trade-off scheduling: a hybrid optimization approach
H Mokhtari, A Aghaie, J Rahimi, A Mozdgir
The International Journal of Advanced Manufacturing Technology 50, 811-822, 2010
512010
Research on computational intelligence algorithms with adaptive learning approach for scheduling problems with batch processing machines
A Noroozi, H Mokhtari, I Nakhai Kamal Abadi
Neurocompuing, An International Journal 110 (4), 190–203, 2013
492013
Production scheduling with outsourcing scenarios: a mixed integer programming and efficient solution procedure
H Mokhtari, INK Abadi, MR Amin-Naseri
International Journal of Production Research 50 (19), 5372-5395, 2012
472012
Economic Order Quantity for Joint Complementary and Substitutable Items
H Mokhtari
Mathematics and Computers in Simulation, 2018
452018
Scheduling with an outsourcing option on both manufacturer and subcontractors
H Mokhtari, INK Abadi
Computers & Operations Research 40 (5), 1234-1242, 2013
442013
Redesign Strategies of a Comprehensive Robust Relief Network for Disaster Management
A Hasani, H Mokhtari
Socio-Economic Planning Sciences, 2018
412018
Cardinality constrained portfolio optimization using a hybrid approach based on particle swarm optimization and hopfield neural network
A Naimi Sadigh, H Mokhtari, M Iranpoor, SMT Fatemi Ghomi
Advanced Science Letters 17 (1), 11-20, 2012
412012
A robust scheduling of projects with time, cost, and quality considerations
A Salmasnia, H Mokhtari, I Nakhai Kamal Abadi
The International Journal of Advanced Manufacturing Technology 60, 631-642, 2012
402012
An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem
H Mokhtari, A Noroozi
Journal of Intelligent Manufacturing, DOI /10.1007/s10845-015-1158-x, 2015
382015
Comparison of Particle Swarm Optimization and Simulated Annealing for Locating Additional Boreholes Considering Combined Variance Minimization
S Soltani-Mohammadi, M Safa, H Mokhtari
Computers & Geosciences 95, 146-155, 2016
352016
The system can't perform the operation now. Try again later.
Articles 1–20