Geraldine Cheok
Geraldine Cheok
Unknown affiliation
Verified email at nist.gov
TitleCited byYear
A hybrid reinforced precast frame for seismic regions
GS Cheok
PCI journal 42 (2), 1997
2251997
Performance of hybrid moment-resisting precast beam-column concrete connections subjected to cyclic loading
WC Stone, GS Cheok, JF Stanton
Structural Journal 92 (2), 229-249, 1995
1451995
Model precast concrete beam-to-column connections subject to cyclic loading
GS Cheok, HS Lew
PCI journal 38 (4), 80-92, 1993
1351993
Performance of precast concrete beam-to-column connections subject to cyclic loading.
GS Cheok, HS Lew
PCI journal 36 (3), 56-67, 1991
1111991
Ladars for construction assessment and update
GS Cheok, WC Stone, RR Lipman, C Witzgall
Automation in Construction 9 (5-6), 463-477, 2000
942000
Inelastic behavior of full-scale bridge columns subjected to cyclic loading
WC Stone, GS Cheok
721989
Seismic response of precast concrete frames with hybrid connections
GS Cheok, WC Stone, SK Kunnath
Structural Journal 95 (5), 527-539, 1998
701998
Fast automatic registration of range images from 3D imaging systems using sphere targets
M Franaszek, GS Cheok, C Witzgall
Automation in Construction 18 (3), 265-274, 2009
642009
Performance of 1/3-scale Model Precast Concrete Beam-column Connections Subjected to Cyclic Inelastic Loads: Report No. 2
GS Cheok, HS Lew
US National Institute of Standards and Technology, 1991
621991
Calibration experiments of a Laser Scanner
GS Cheok, S Leigh, A Rukhin
NASA STI/Recon Technical Report N 2, 2002
482002
Using LADAR to characterize the 3-D shape of aggregates: Preliminary results
EJ Garboczi, GS Cheok, WC Stone
Cement and Concrete Research 36 (6), 1072-1075, 2006
402006
Seismic performance of masonry walls with bed joint reinforcement
AE Schultz, RS Hutchinson, GS Cheok
Structural Engineers World Congress, 1998
391998
Non-intrusive scanning technology for construction assessment
GS Cheok, WC Stone
International Symposium on Automation and Robotics in Construction, 1999
351999
Behavior of 1/6-scale model bridge columns subjected to inelastic cyclic loading
GS Cheok
Structural Journal 87 (6), 630-638, 1990
331990
Simplified design procedure for hybrid precast concrete connections
GS Cheok, WC Stone, SD Nakaki
Building and Fire Research Laboratory, National Institute of Standards and …, 1996
311996
Real-time drill monitoring and control using building information models augmented with 3D imaging data
M Akula, RR Lipman, M Franaszek, KS Saidi, GS Cheok, VR Kamat
Automation in Construction 36, 1-15, 2013
292013
Experimental study of gusseted connections for laterally braced steel buildings
JL Gross, G Cheok, JL Gross
US Department of Commerce, National Institute of Standards and Technology, 1988
271988
Construction object identification from LADAR scans: an experimental study using I-beams
DE Gilsinn, DE Gilsinn, GS Cheok, A Lytle
US Department of Commerce, National Institute of Standards and Technology, 2005
262005
Field demonstration of laser scanning for excavation measurement
GS Cheok, RR Lipman, C Witzgall, J Bernal, WC Stone
Proceedings of ISARC 2000, 2000
242000
Behaviour of 1/6 scale model bridge columns subjected to cyclic inelastic loading
GS Cheok, WC Stone
241986
The system can't perform the operation now. Try again later.
Articles 1–20