Anil Sawhney, PhD, FRICS FHEA
Anil Sawhney, PhD, FRICS FHEA
Verified email at ljmu.ac.uk - Homepage
Title
Cited by
Cited by
Year
Analysing factors affecting delays in Indian construction projects
H Doloi, A Sawhney, KC Iyer, S Rentala
International Journal of Project Management, 2011
6322011
Structural equation model for assessing impacts of contractor's performance on project success
H Doloi, KC Iyer, A Sawhney
International journal of project management 29 (6), 687-695, 2011
2512011
Structural equation model for investigating factors affecting delay in Indian construction projects
H Doloi, A Sawhney, KC Iyer
Construction Management and Economics 30 (10), 869-884, 2012
1112012
Adaptive probabilistic neural network-based crane type selection system
A Sawhney, A Mund
Journal of construction engineering and management 128 (3), 265-273, 2002
842002
Internet based interactive construction management learning system
A Sawhney, J Marble, A Mund, A Vamadevan
Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000
782000
Implications of even flow production methodology for US housing industry
HH Bashford, A Sawhney, KD Walsh, K Kot
Journal of Construction Engineering and Management 129 (3), 330-337, 2003
732003
Construction engineering and project management II: agent-based modeling and simulation in construction
A Sawhney, H Bashford, K Walsh, AR Mulky
Proceedings of the 35th conference on Winter simulation: driving innovation …, 2003
722003
HSM-Simulation–Based planning method for construction projects
A Sawhney, SM AbouRizk
Journal of construction engineering and management 121 (3), 297-303, 1995
701995
Environmental impacts over the life cycle of residential buildings using different exterior wall systems
R Kahhat, J Crittenden, F Sharif, E Fonseca, K Li, A Sawhney, P Zhang
Journal of Infrastructure Systems 15 (3), 211-221, 2009
672009
Production system loading–cycle time relationship in residential construction
HH Bashford, KD Walsh, A Sawhney
Journal of Construction Engineering and Management 131 (1), 15-22, 2005
662005
Construction project simulation using CYCLONE
A Sawhney, SM AbouRizk, DW Halpin
Canadian Journal of Civil Engineering 25 (1), 16-25, 1998
641998
Issues of construction health and safety in developing countries: a case of Jordan
S Zaid Alkilani, J Jupp, A Sawhney
Australasian Journal of Construction Economics and Building, The 13 (3), 141, 2013
622013
Subjective and interactive duration estimation
SM AbouRizk, A Sawhney
Canadian journal of civil engineering 20 (3), 457-470, 1993
561993
Modeling and analysis of concrete production plant using Petri nets
A Sawhney, O Abudayyeh, T Chaitavatputtiporn
Journal of Computing in Civil Engineering 13 (3), 178-186, 1999
521999
Driving lean and green project outcomes using BIM: A qualitative comparative analysis
R Ahuja, A Sawhney, M Arif
International Journal of Sustainable Built Environment 6 (1), 69-80, 2017
512017
Adoption of BIM by architectural firms in India: technology–organization–environment perspective
R Ahuja, M Jain, A Sawhney, M Arif
Architectural Engineering and Design Management 12 (4), 311-330, 2016
492016
Petri Net based simulation of construction schedules
A Sawhney
Proceedings of the 29th conference on Winter simulation, 1111-1118, 1997
411997
Area of linkage between lean construction and sustainability in Indian construction industry
S Dixit, SN Mandal, A Sawhney, S Singh
International Journal of Civil Engineering and Technology 8 (8), 2017
402017
Grand challenges for the Indian construction industry
A Sawhney, R Agnihotri, VK Paul
Built Environment Project and Asset Management, 2014
402014
Factors influencing BIM adoption in emerging markets–the case of India
R Ahuja, A Sawhney, M Jain, M Arif, S Rakshit
International Journal of Construction Management 20 (1), 65-76, 2020
372020
The system can't perform the operation now. Try again later.
Articles 1–20