Anil Sawhney, PhD, FRICS FHEA
Anil Sawhney, PhD, FRICS FHEA
Verified email at ljmu.ac.uk - Homepage
TitleCited byYear
Analysing factors affecting delays in Indian construction projects
H Doloi, A Sawhney, KC Iyer, S Rentala
International Journal of Project Management, 2011
3982011
Structural equation model for assessing impacts of contractor's performance on project success
H Doloi, KC Iyer, A Sawhney
International journal of project management 29 (6), 687-695, 2011
1812011
Structural equation model for investigating factors affecting delay in Indian construction projects
H Doloi, A Sawhney, KC Iyer
Construction Management and Economics 30 (10), 869-884, 2012
782012
Internet based interactive construction management learning system
A Sawhney, J Marble, A Mund, A Vamadevan
Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000
732000
Implications of even flow production methodology for US housing industry
HH Bashford, A Sawhney, KD Walsh, K Kot
Journal of Construction Engineering and Management 129 (3), 330-337, 2003
652003
Production system loading–cycle time relationship in residential construction
HH Bashford, KD Walsh, A Sawhney
Journal of Construction Engineering and Management 131 (1), 15-22, 2005
622005
Adaptive probabilistic neural network-based crane type selection system
A Sawhney, A Mund
Journal of construction engineering and management 128 (3), 265-273, 2002
622002
Construction engineering and project management II: agent-based modeling and simulation in construction
A Sawhney, H Bashford, K Walsh, AR Mulky
Proceedings of the 35th conference on Winter simulation: driving innovation …, 2003
612003
HSM-Simulation–Based planning method for construction projects
A Sawhney, SM AbouRizk
Journal of construction engineering and management 121 (3), 297-303, 1995
611995
Construction project simulation using CYCLONE
A Sawhney, SM AbouRizk, DW Halpin
Canadian Journal of Civil Engineering 25 (1), 16-25, 1998
581998
Environmental impacts over the life cycle of residential buildings using different exterior wall systems
R Kahhat, J Crittenden, F Sharif, E Fonseca, K Li, A Sawhney, P Zhang
Journal of Infrastructure Systems 15 (3), 211-221, 2009
572009
Subjective and interactive duration estimation
SM AbouRizk, A Sawhney
Canadian journal of civil engineering 20 (3), 457-470, 1993
491993
Modeling and analysis of concrete production plant using Petri nets
A Sawhney, O Abudayyeh, T Chaitavatputtiporn
Journal of Computing in Civil Engineering 13 (3), 178-186, 1999
451999
Production equations for unsteady-state construction processes
KD Walsh, A Sawhney, HH Bashford
Journal of Construction Engineering and Management 133 (3), 254-261, 2007
382007
Issues of construction health and safety in developing countries: a case of Jordan
S Zaid Alkilani, J Jupp, A Sawhney
Australasian Journal of Construction Economics and Building, The 13 (3), 141, 2013
362013
Development of a framework for quantifying the environmental impacts of urban development and construction practices
K Li, P Zhang, JC Crittenden, S Guhathakurta, Y Chen, H Fernando, ...
Environmental science & technology 41 (14), 5130-5136, 2007
362007
Petri Net based simulation of construction schedules
A Sawhney
Winter Simulation Conference, 1111-1118, 1997
361997
Simulation and gaming in construction engineering education
SM AbouRizk, A Sawhney
American Society for Engineering Education conference. Retrieved Aug 1, 2003, 1994
361994
Application of the DEVS framework in construction simulation
S Palaniappan, A Sawhney, HS Sarjoughian
Proceedings of the 2006 Winter Simulation Conference, 2077-2086, 2006
312006
Simulation based construction management learning system
A Sawhney, A Mund
1998 Winter Simulation Conference. Proceedings (Cat. No. 98CH36274) 2, 1319-1324, 1998
281998
The system can't perform the operation now. Try again later.
Articles 1–20