Reconfigurable standardized work in a lean company–a case study A Pereira, MF Abreu, D Silva, AC Alves, JA Oliveira, I Lopes, ... Procedia Cirp 52, 239-244, 2016 | 96 | 2016 |
Preventive maintenance decisions through maintenance optimization models: a case study S Vilarinho, I Lopes, JA Oliveira Procedia Manufacturing 11, 1170-1177, 2017 | 89 | 2017 |
Requirements specification of a computerized maintenance management system–a case study I Lopes, P Senra, S Vilarinho, V Sá, C Teixeira, J Lopes, A Alves, ... Procedia Cirp 52, 268-273, 2016 | 87 | 2016 |
Six Sigma application for quality improvement of the pin insertion process JP Costa, IS Lopes, JP Brito Procedia Manufacturing 38, 1592-1599, 2019 | 85 | 2019 |
Developing dashboards for SMEs to improve performance of productive equipment and processes S Vilarinho, I Lopes, S Sousa Journal of Industrial Information Integration 12, 13-22, 2018 | 73 | 2018 |
Classification methodology for spare parts management combining maintenance and logistics perspectives C Teixeira, I Lopes, M Figueiredo Journal of Management Analytics 5 (2), 116-135, 2018 | 68 | 2018 |
Multi-criteria classification for spare parts management: a case study C Teixeira, I Lopes, M Figueiredo Procedia Manufacturing 11, 1560-1567, 2017 | 50 | 2017 |
Condition-based maintenance implementation: a literature review HN Teixeira, I Lopes, AC Braga Procedia Manufacturing 51, 228-235, 2020 | 47 | 2020 |
Principles and practices of lean production applied in a metal structures production system R Carvalho, AC Alves, IS Lopes International Association of Engineers (IAENG), 2011 | 43 | 2011 |
Application of data mining in a maintenance system for failure prediction P Bastos, I Lopes, L Pires Safety, Reliability and Risk Analysis: Beyond the Horizon: 22nd European …, 2014 | 42 | 2014 |
A maintenance prediction system using data mining techniques P Bastos, I Lopes, L Pires World Congress on Engineering 2012 3, 1448-1453, 2012 | 41 | 2012 |
Evaluation and improvement of maintenance management performance using a maturity model MA Oliveira, I Lopes International Journal of Productivity and Performance Management 69 (3), 559-581, 2020 | 40 | 2020 |
Use of maintenance performance indicators by companies of the industrial hub of Manaus M Oliveira, I Lopes, C Rodrigues Procedia CIRP 52, 157-160, 2016 | 39 | 2016 |
Prioritizing quality problems in SMEs: A methodology HN Teixeira, I Lopes, S Sousa The TQM Journal 27 (1), 2-21, 2015 | 38 | 2015 |
Design procedure to develop dashboards aimed at improving the performance of productive equipment and processes S Vilarinho, I Lopes, S Sousa Procedia Manufacturing 11, 1634-1641, 2017 | 36 | 2017 |
Measuring and managing operational risk in industrial processes S Sousa, E Nunes, I Lopes Fme Transactions 43 (4), 295-302, 2015 | 33 | 2015 |
Quality improvement practices adopted by industrial companies in Portugal IS Lopes, EP Nunes, S Sousa, D Esteves International Association of Engineers (IAENG), 2011 | 32 | 2011 |
Using Six Sigma to improve complaints handling P Abreu, S Sousa, IS Lopes International Association of Engineers (IAENG), 2012 | 29 | 2012 |
Maintenance management based on organization maturity level MM Oliveira, IS Lopes, D Figueiredo | 27 | 2012 |
Supporting maintenance scheduling: A case study P Senra, I Lopes, JA Oliveira Procedia Manufacturing 11, 2123-2130, 2017 | 23 | 2017 |