Follow
Asieh Hekmat
Asieh Hekmat
Assistant Professor, University of Concepcion- Chile
Verified email at udec.cl
Title
Cited by
Cited by
Year
Prediction of shovel productivity in the Gol-e-Gohar iron mine
M Osanloo, A Hekmat
Journal of Mining science 41 (2), 177-184, 2005
512005
New approach for selection of waste dump sites in open pit mines
A Hekmat, M Osanloo, AM Shirazi
Mining technology 117 (1), 24-31, 2008
312008
Springer International Publishing: Cham
E Widzyk-Capehart, A Hekmat, R Singhal
Switzerland, 2019
292019
Experimental quantification of hang-up for block caving applications
R Castro, R Gómez, A Hekmat
International Journal of Rock Mechanics and Mining Sciences 85, 1-9, 2016
262016
A comminution model for secondary fragmentation assessment for block caving
R Gómez, RL Castro, A Casali, S Palma, A Hekmat
Rock Mechanics and Rock Engineering 50, 3073-3084, 2017
202017
Prediction of rock fragmentation based on a modified Kuz-Ram model
A Hekmat, S Munoz, R Gomez
Proceedings of the 27th international symposium on mine planning and …, 2019
172019
Productivity of a continuous mining system for block caving mines
LF Orellana, R Castro, A Hekmat, E Arancibia
Rock Mechanics and Rock Engineering 50, 657-663, 2017
152017
Block size selection with the objective of minimizing the discrepancy in real and estimated block grade
A Hekmat, M Osanloo, P Moarefvand
Arabian Journal of Geosciences 6, 141-155, 2013
122013
Mud inflow risk assessment in block caving operation based on AHP comprehensive method
A Hekmat, A Anani, F Tapia, I Navia
Proceedings of the 18th Symposium on Environmental Issues and Waste …, 2019
112019
Reclamation of granite stone quarry—a case study in Jostan Granite Mine, Tehran, Iran
M Osanloo, A Hekmat, A Aghajani Bazazi
1st international seminar on mine closure, Perth, Australia, 2006
102006
Influence of fine material, humidity and vertical loads on the flowability of caved rock
D Olivares, R Castro, A Hekmat
ARMA US Rock Mechanics/Geomechanics Symposium, ARMA-2015-582, 2015
72015
Optimizing cut-out distance for maximum coal productivity
A Anani, W Nyaaba, A Hekmat, EA Cordova
Simulation 95 (6), 545-559, 2019
62019
Automation fundamentals of continuous mining system
R Castro, J Riquelme, E Widzyk-Capehart, A Hekmat, J Baraqui
International Journal of Mining, Reclamation and Environment 29 (5), 419-432, 2015
62015
FlowSim–A versatile flow simulation tool to quantify extraction and design alternatives for block caving
R Castro, A Hekmat, M Fuentes, F Armijo, F Rodriguez
Proceedings of MassMin, 645-652, 2016
52016
Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection-MPES 2018
E Widzyk-Capehart, A Hekmat, R Singhal
Springer, 2019
22019
Combining geomechanical and hydrogeological modeling for drainage analysis in Block Caving mine development
R Díaz, R Gómez, R Vidal, A Hekmat, D Oyarzo
International Journal of Rock Mechanics and Mining Sciences 173, 105606, 2024
12024
Proceedings of the 18th Symposium on Environmental Issues and Waste Management in Energy and Mineral Production: SWEMP 2018—Selected Works
E Widzyk-Capehart, A Hekmat, R Singhal
Springer, 2018
12018
Optimization of coal production rate as a function of cut-out distance
A Anani, W Nyaaba, A Hekmat
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
2019
A dilution model for narrow vein mine design—a case study
F Marco, JA Vallejos, R Castro, A Hekmat
Design Methods 2015: Proceedings of the International Seminar on Design …, 2015
2015
Automation fundamentals of continuous mining system
R Castro Ruiz, J Riquelme Aguilar, E Widzyk-Capehart, A Hekmat, ...
Taylor & Francis, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–20