Noor Amila Wan Abdullah Zawawi
Noor Amila Wan Abdullah Zawawi
Director, Institute of Self-sustainable Building, Associate Professor, Civil & Environmental
Verified email at utp.edu.my
Title
Cited by
Cited by
Year
Identification of coordination factors affecting building projects performance
WS Alaloul, MS Liew, NAWA Zawawi
Alexandria Engineering Journal 55 (3), 2689-2698, 2016
492016
Industrial Revolution 4.0 in the construction industry: Challenges and opportunities for stakeholders
WS Alaloul, MS Liew, NAWA Zawawi, IB Kennedy
Ain Shams Engineering Journal 11 (1), 225-230, 2020
372020
A review of walking energy harvesting using piezoelectric materials
EM Nia, NAWA Zawawi, BSM Singh
IOP Conference Series: Materials Science and Engineering 291 (1), 012026, 2017
302017
Industry revolution IR 4.0: future opportunities and challenges in construction industry
WS Alaloul, MS Liew, NAWA Zawawi, BS Mohammed
MATEC web of conferences 203, 02010, 2018
292018
A multivariable regression tool for embodied carbon footprint prediction in housing habitat
SSS Gardezi, N Shafiq, NAWA Zawawi, MF Khamidi, SA Farhan
Habitat International 53, 2016
252016
Slow adoption of PPPs in developing countries: Survey of Nigerian Construction professionals
AG Otairu, AA Umar, NAWA Zawawi, M Sodangi, DB Hammad
Procedia Engineering 77, 188-195, 2014
252014
Decommissioning of offshore platform: A sustainable framework
NAWA Zawawi, MS Liew, KL Na
2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 26-31, 2012
242012
Financing PF2 projects: Opportunities for Islamic project finance
NAWA Zawawi, M Ahmad, AA Umar, MF Khamidi, A Idrus
Procedia engineering 77, 179-187, 2014
202014
An Artificial neural networks (ANN) model for evaluating construction project performance based on coordination factors
WS Alaloul, MS Liew, NAW Zawawi, BS Mohammed, M Adamu
Cogent Engineering 5 (1), 1507657, 2018
162018
Delphi technique procedures: a new perspective in construction management research
WS Alaloul, MS Liew, NAW Zawawi
Applied Mechanics and Materials 802, 661-667, 2015
162015
Sustainable construction practice: a review of change orders (CO) in construction projects
N Zawawi, N Azman, S Kamar, M Shamil
International Conference on Environment, Pulau Pinang, Malaysia, 2010
162010
A framework for coordination process into construction projects
WS Alaloul, MS Liew, NABWA Zawawi
MATEC Web of Conferences 66, 00079, 2016
132016
Communication, coordination and cooperation in construction projects: business environment and human behaviours
WS Alaloul, MS Liew, NAW Zawawi
IOP Conference Series: Materials Science and Engineering 291 (1), 012003, 2017
122017
An expert knowledge based decommissioning alternative selection system for fixed oil and gas assets in the South China Sea
KL Na, HE Lee, MS Liew, NAWA Zawawi
Ocean Engineering 130, 645-658, 2017
122017
Coordination process in construction projects management
WS Alaloul, MS Liew, N Zawawi
Engineering Challenges for Sustainable Future: Proceedings of the 3rd …, 2016
122016
Experimental study on axial compressive behavior of rubberized interlocking masonry walls
A Al-Fakih, MMA Wahab, BS Mohammed, MS Liew, NAWA Zawawi, ...
Journal of Building Engineering 29, 101107, 2020
112020
Development of response surface models for self-compacting hybrid fibre reinforced rubberized cementitious composite
VC Khed, BS Mohammed, MS Liew, NAWA Zawawi
Construction and Building Materials 232, 117191, 2020
112020
The characteristics of coordination process in construction projects
W Alaloul, MS Liew, NAWA Zawawi
2015 International Symposium on Technology Management and Emerging …, 2015
112015
Stakeholder perceptions on achieved benefits of PFI procurement strategy
AA Umar, NAWA Zawawi, MF Khamidi, A Idrus
Modern Applied Science 7 (4), 31, 2013
112013
Embodied carbon potential of conventional construction materials used in typical Malaysian single storey low cost house using Building Information Modeling (BIM)
SSS Gardezi, N Shafiq, NAWA Zawawi, SA Farhan
Advanced Materials Research 1043, 242-246, 2014
92014
The system can't perform the operation now. Try again later.
Articles 1–20