Marcelo Azambuja
TitleCited byYear
Supply Chain Modeling: Issues and Perspectives
M Azambuja, WJ O’Brien
Construction supply chain management handbook, 2008
502008
Strategic procurement practices for the industrial supply chain
MM Azambuja, S Ponticelli, WJ O’Brien
Journal of Construction Engineering and Management 140 (7), 06014005, 2014
172014
Guidelines for the improvement of design, procurement and installation of elevators using supply chain management concepts
MMB Azambuja, CT Formoso
Proc. Eleventh Annual Conference of the International Group for Lean …, 2003
172003
The role of commitments in the management of construction make-to-order supply chains
EL Isatto, M Azambuja, CT Formoso
Journal of management in engineering 31 (4), 04014053, 2013
152013
Rapid assessment and selection of engineered equipment suppliers
MM Azambuja, WJ O'Brien
Automation in Construction 22, 587-596, 2012
152012
Cloud-based materials tracking system prototype integrated with radio frequency identification tagging technology
HS Ko, M Azambuja, HF Lee
Automation in Construction 63, 144-154, 2016
142016
BIM across the construction curriculum
C Gordon, M Azambuja, AM Werner
Proceeding of the 2009 ASC Region III Conference, 19, 2009
132009
Caracterização da produção científica de áreas de conhecimento específicas: aplicação à gestão e economia da construção
DN Pithan, MMB Azambuja, CT Formoso, JP Barros Neto
Ambiente construído: revista da Associação Nacional de Tecnologia do …, 2005
132005
Teaching lean construction: perspectives on theory and practice
CCY Tsao, M Azambuja, FR Hamzeh, ZK Rybkowski
International Group for Lean Construction, 2013
92013
The importance of commitments management to the integration of make-to-order supply chains in construction industry
MMB Azambuja, EL Isatto, TS Marder, CT Formoso
Proc. Fourteenth Annual Conference of the International Group for Lean …, 2006
92006
Accelerating the adoption of lean thinking in the construction industry
D Naney, C Goser, M Azambuja
Proceedings for the 20th International Group for Lean Construction, 291-300, 2012
72012
Aligning Near and Long Term Planning for LPS Implementations: A Review of Existing and New Metrics
S Emdanat, M Azambuja
Proceedings for the 24th Annual Conference of the International Group for …, 2016
62016
Visualizing construction supply chains with google cloud computing tools
J Gong, M Azambuja
ICSDEC 2012: Developing the Frontier of Sustainable Design, Engineering, and …, 2013
62013
Leveraging building information models to support supply chain decisions in construction projects
M Azambuja, T Alves, F Leite, J Gong
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
62012
Risk Assessment of a Ready-Mix Concrete Supply Chain
M Azambuja, X Chen
Construction Research Congress 2014: Construction in a Global Network, 1695-1703, 2014
42014
Enabling lean supply with a cloud computing platform–an exploratory case study
M Azambuja, T Schnitzer, M Sahin, F Lee
Formoso, CT & Tzortzopoulos, P., 21th Annual Conference of the International …, 2013
42013
Findings on determining durations of right-of-way acquisition and utility adjustment on highway projects
JT OConnor, W OBrien, T Sohn, M Azambuja
42008
Processo de Projeto, Aquisição e Instalação de Elevadores em Edifícios: Diagnóstico e Propostas de Melhoria. 2002. 155 p
MMB AZAMBUJA
Dissertação (Mestrado em Engenharia)-Programa de Pós-Graduação em Engenharia …, 2002
42002
O papel do comprometimento na integração das cadeias de produtos feitos sob encomenda na indústria da construção
TS Marder, MMB Azambuja, EL Isatto, CT Formoso
CONFERÊNCIA LATINO-AMERICANA DE CONSTRUÇÃO SUSTENTÁVEL 1, 2004
32004
Diretrizes para a melhoria dos processos de projeto, aquisição e instalação de elevadores utilizando conceitos de gestão da cadeia de suprimentos
MMB Azambuja, CT Formoso
Ambiente construído: revista da Associação Nacional de Tecnologia do …, 2003
32003
The system can't perform the operation now. Try again later.
Articles 1–20