Marcelo Azambuja
TitleCited byYear
Supply Chain Modeling: Issues and Perspectives
M Azambuja, WJ O’Brien
Construction supply chain management handbook, 2008
492008
Guidelines for the improvement of design, procurement and installation of elevators using supply chain management concepts
MMB Azambuja, CT Formoso
Proc. Eleventh Annual Conference of the International Group for Lean …, 2003
172003
Strategic procurement practices for the industrial supply chain
MM Azambuja, S Ponticelli, WJ O’Brien
Journal of Construction Engineering and Management 140 (7), 06014005, 2014
162014
Rapid assessment and selection of engineered equipment suppliers
MM Azambuja, WJ O'Brien
Automation in Construction 22, 587-596, 2012
162012
The role of commitments in the management of construction make-to-order supply chains
EL Isatto, M Azambuja, CT Formoso
Journal of management in engineering 31 (4), 04014053, 2013
142013
BIM across the construction curriculum
C Gordon, M Azambuja, AM Werner
Proceeding of the 2009 ASC Region III Conference, 19, 2009
142009
Cloud-based materials tracking system prototype integrated with radio frequency identification tagging technology
HS Ko, M Azambuja, HF Lee
Automation in Construction 63, 144-154, 2016
132016
Caracterização da produção científica de áreas de conhecimento específicas: aplicação à gestão e economia da construção
DN Pithan, MMB Azambuja, CT Formoso, JP Barros Neto
Ambiente construído: revista da Associação Nacional de Tecnologia do …, 2005
132005
Teaching lean construction: perspectives on theory and practice
CCY Tsao, M Azambuja, FR Hamzeh, ZK Rybkowski
International Group for Lean Construction, 2013
92013
The importance of commitments management to the integration of make-to-order supply chains in construction industry
MMB Azambuja, EL Isatto, TS Marder, CT Formoso
Proc. Fourteenth Annual Conference of the International Group for Lean …, 2006
72006
Visualizing construction supply chains with google cloud computing tools
J Gong, M Azambuja
2nd Annual International Conference Sustainable Design, Engineering and …, 2013
62013
Leveraging building information models to support supply chain decisions in construction projects
M Azambuja, T Alves, F Leite, J Gong
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
62012
Accelerating the adoption of lean thinking in the construction industry
D Naney, C Goser, M Azambuja
Proceedings of the 20th Annual Conference of the International Group for …, 2012
62012
Aligning Near and Long Term Planning for LPS Implementations: A Review of Existing and New Metrics
S Emdanat, M Azambuja
Proceedings for the 24th Annual Conference of the International Group for …, 2016
52016
Enabling lean supply with a cloud computing platform–an exploratory case study
M Azambuja, T Schnitzer, M Sahin, F Lee
Formoso, CT & Tzortzopoulos, P., 21th Annual Conference of the International …, 2013
42013
Findings on determining durations of right-of-way acquisition and utility adjustment on highway projects
JT OConnor, W OBrien, T Sohn, M Azambuja
42008
Processo de Projeto, Aquisição e Instalação de Elevadores em Edifícios: Diagnóstico e Propostas de Melhoria. 2002. 155 p
MMB AZAMBUJA
Dissertação (Mestrado em Engenharia)-Programa de Pós-Graduação em Engenharia …, 2002
42002
Risk Assessment of a Ready-Mix Concrete Supply Chain
M Azambuja, X Chen
Construction Research Congress, ASCE, 1695-1703, 2014
32014
Diretrizes para a melhoria dos processos de projeto, aquisição e instalação de elevadores utilizando conceitos de gestão da cadeia de suprimentos
MMB Azambuja, CT Formoso
Ambiente construído: revista da Associação Nacional de Tecnologia do …, 2003
32003
O papel do comprometimento na integração das cadeias de produtos feitos sob encomenda na indústria da construção
T MARDER, MMB Azambuja, EL Isatto, CT Formoso
CONFERÊNCIA LATINO-AMERICANA DE CONSTRUÇÃO SUSTENTÁVEL 1, 0
3
The system can't perform the operation now. Try again later.
Articles 1–20