A survey of scheduling rules SS Panwalkar, W Iskander Operations research 25 (1), 45-61, 1977 | 1868 | 1977 |
Common due date assignment to minimize total penalty for the one machine scheduling problem SS Panwalkar, ML Smith, A Seidmann Operations research 30 (2), 391-399, 1982 | 553 | 1982 |
The lessons of flowshop scheduling research RA Dudek, SS Panwalkar, ML Smith Operations Research 40 (1), 7-13, 1992 | 311 | 1992 |
Sequencing research and the industrial scheduling problem SS Panwalkar, RA Dudek, ML Smith Symposium on the Theory of Scheduling and its Applications, 29-38, 1973 | 263 | 1973 |
Optimal assignment of due-dates for a single processor scheduling problem A Seidmann, SS Panwalkar, ML Smith The International Journal Of Production Research 19 (4), 393-399, 1981 | 238 | 1981 |
Common due window size and location determination in a single machine scheduling problem SD Liman, SS Panwalkar, S Thongmee Journal of the Operational Research Society 49, 1007-1010, 1998 | 168 | 1998 |
Single-machine sequencing with controllable processing times SS Panwalkar, R Rajagopalan European Journal of Operational Research 59 (2), 298-302, 1992 | 127 | 1992 |
A heuristic for the single machine tardiness problem SS Panwalkar, ML Smith, CP Koulamas European Journal of Operational Research 70 (3), 304-310, 1993 | 119 | 1993 |
Flowshop sequencing problem with ordered processing time matrices ML Smith, SS Panwalkar, RA Dudek Management Science 21 (5), 544-549, 1975 | 107 | 1975 |
Scheduling in a two-stage manufacturing process SL NARASTMHAN, SS PANWALKAR THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 22 (4), 555-564, 1984 | 95 | 1984 |
Determination of common due window location in a single machine scheduling problem SD Liman, SS Panwalkar, S Thongmee European Journal of Operational Research 93 (1), 68-74, 1996 | 87 | 1996 |
Scheduling of a two-machine flowshop with travel time between machines SS Panwalkar Journal of the operational Research Society 42, 609-613, 1991 | 77 | 1991 |
Flowshop sequencing problem with ordered processing time matrices: A general case ML Smith, SS Panwalkar, RA Dudek Naval Research Logistics Quarterly 23 (3), 481-486, 1976 | 61 | 1976 |
Review of the ordered and proportionate flow shop scheduling research SS Panwalkar, ML Smith, C Koulamas Naval Research Logistics (NRL) 60 (1), 46-55, 2013 | 58 | 2013 |
An ordered flow-shop sequencing problem with mean completion time criterion SS Panwalkar, AW Khan The International Journal of Production Research 14 (5), 631-635, 1976 | 52 | 1976 |
A single machine scheduling problem with common due window and controllable processing times SD Liman, SS Panwalkar, S Thongmee Annals of Operations Research 70 (0), 145-154, 1997 | 49 | 1997 |
Ordered flow shop problems with no in-process waiting: Further results SS Panwalkar, CR Woollam Journal of the Operational Research Society 31 (11), 1039-1043, 1980 | 42 | 1980 |
Flow shop scheduling problems with no in-process waiting: a special case SS Panwalkar, CR Woollam Journal of the Operational Research Society, 661-664, 1979 | 38 | 1979 |
Use of a case study in sequencing/scheduling research RA Dudek, ML Smith, SS Panwalkar Omega 2 (2), 253-261, 1974 | 33 | 1974 |
Single stage minimum absolute lateness problem with a common due date on non-identical machines B Alidaee, SS Panwalkar Journal of the Operational Research Society 44, 29-36, 1993 | 32 | 1993 |