John Fowler
TitleCited byYear
Virus taxonomy: ninth report of the International Committee on Taxonomy of Viruses
AMQ King, E Lefkowitz, MJ Adams, EB Carstens
Elsevier, 2011
22952011
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
JK Cochran, SM Horng, JW Fowler
Computers & Operations Research 30 (7), 1087-1102, 2003
2882003
Grand challenges in modeling and simulation of complex manufacturing systems
JW Fowler, O Rose
Simulation 80 (9), 469-476, 2004
2742004
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzere-Peres, SJ Mason, O Rose
Journal of scheduling 14 (6), 583-599, 2011
2492011
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
SJ Mason, JW Fowler, W Matthew Carlyle
Journal of Scheduling 5 (3), 247-262, 2002
2352002
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
L Mönch, H Balasubramanian, JW Fowler, ME Pfund
Computers & Operations Research 32 (11), 2731-2750, 2005
2142005
A new scheduling approach using combined dispatching criteria in wafer fabs
RM Dabbas, JW Fowler
IEEE Transactions on semiconductor manufacturing 16 (3), 501-510, 2003
1652003
Real-time control of multiproduct bulk-service semiconductor manufacturing processes
JW Fowler, DT Phillips, GL Hogg
IEEE Transactions on Semiconductor Manufacturing 5 (2), 158-163, 1992
1561992
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
H Balasubramanian, L Mönch, J Fowler, M Pfund
International Journal of Production Research 42 (8), 1621-1638, 2004
1462004
Measurement and improvement of manufacturing capacities (MIMAC): Final report
J Fowler, J Robinson
Technical Report 95062861A-TR, SEMATECH, Austin, TX, 1995
1441995
Production planning and control for semiconductor wafer fabrication facilities: modeling, analysis, and systems
L Mönch, JW Fowler, SJ Mason
Springer Science & Business Media, 2012
1422012
Mixed integer programming formulations for single machine scheduling problems
AB Keha, K Khowala, JW Fowler
Computers & Industrial Engineering 56 (1), 357-367, 2009
1312009
Bi‐criteria scheduling of surgical services for an outpatient procedure center
S Gul, BT Denton, JW Fowler, T Huschka
Production and Operations management 20 (3), 406-417, 2011
1292011
Scheduling jobs on parallel machines with setup times and ready times
M Pfund, JW Fowler, A Gadkari, Y Chen
Computers & Industrial Engineering 54 (4), 764-782, 2008
1262008
The use of upstream and downstream information in scheduling semiconductor batch operations
JK Robinson, JW Fowler, JF Bard
International Journal of Production Research 33 (7), 1849-1869, 1995
1191995
Minimizing total weighted tardiness on a single batch process machine with incompatible job families
IC Perez, JW Fowler, WM Carlyle
Computers & Operations Research 32 (2), 327-341, 2005
1172005
Workload control in the semiconductor industry
JW Fowler, GL Hogg, SJ Mason
Production Planning & Control 13 (7), 568-578, 2002
1152002
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
L Mönch, R Schabacker, D Pabst, JW Fowler
European Journal of Operational Research 177 (3), 2100-2118, 2007
1142007
Heuristics for workforce planning with worker differences
JW Fowler, P Wirojanagud, ES Gel
European Journal of Operational Research 190 (3), 724-740, 2008
1132008
A combined dispatching criteria approach to scheduling semiconductor manufacturing systems
RM Dabbas, HN Chen, JW Fowler, D Shunk
Computers & industrial engineering 39 (3-4), 307-324, 2001
1082001
The system can't perform the operation now. Try again later.
Articles 1–20