Pascal Côté
Pascal Côté
Ingénieur analyste en recherche opérationnelle, Rio Tinto Alcan Énergie électrique
Adresse e-mail validée de riotinto.com
Titre
Citée par
Citée par
Année
Comparison of stochastic optimization algorithms in hydrological model calibration
R Arsenault, A Poulin, P Côté, F Brissette
Journal of Hydrologic Engineering 19 (7), 1374-1384, 2014
1622014
A hybrid multi-objective evolutionary algorithm for the uncapacitated exam proximity problem
P Côté, T Wong, R Sabourin
International Conference on the Practice and Theory of Automated Timetabling …, 2004
1212004
Comparing different forest zoning options for landscape-scale management of the boreal forest: possible benefits of the TRIAD
P Côté, R Tittler, C Messier, DD Kneeshaw, A Fall, MJ Fortin
Forest Ecology and Management 259 (3), 418-427, 2010
852010
Stochastic short-term hydropower planning with inflow scenario trees
S Séguin, SE Fleten, P Côté, A Pichler, C Audet
European Journal of Operational Research 259 (3), 1156-1168, 2017
512017
Final exam timetabling: a practical approach
T Wong, P Côté, P Gely
IEEE CCECE2002. Canadian Conference on Electrical and Computer Engineering …, 2002
462002
Comparison of stochastic optimization algorithms for hydropower reservoir operation with ensemble streamflow prediction
P Côté, R Leconte
Journal of Water Resources Planning and Management 142 (2), 04015046, 2016
432016
Self-scheduling short-term unit commitment and loading problem
S Séguin, P Côté, C Audet
IEEE Transactions on Power Systems 31 (1), 133-142, 2015
332015
Stochastic optimisation of Hydro-Quebec hydropower installations: a statistical comparison between SDP and SSDP methods
P Côté, D Haguma, R Leconte, S Krau
Canadian Journal of Civil Engineering 38 (12), 1427-1434, 2011
322011
Water resources optimization method in the context of climate change
D Haguma, R Leconte, S Krau, P Côté, F Brissette
Journal of Water Resources Planning and Management 141 (2), 04014051, 2015
262015
Role of hydrologic information in stochastic dynamic programming: a case study of the Kemano hydropower system in British Columbia
Q Desreumaux, P Côté, R Leconte
Canadian Journal of Civil Engineering 41 (9), 839-844, 2014
232014
Optimal hydropower generation under climate change conditions for a northern water resources system
D Haguma, R Leconte, P Côté, S Krau, F Brissette
Water resources management 28 (13), 4631-4644, 2014
212014
A hybrid MOEA for the capacitated exam proximity problem
T Wong, P Côté, R Sabourin
Proceedings of the 2004 Congress on Evolutionary Computation (IEEE Cat. No …, 2004
192004
MILP formulations for generator maintenance scheduling in hydropower systems
JA Rodriguez, MF Anjos, P Côté, G Desaulniers
IEEE Transactions on Power Systems 33 (6), 6171-6180, 2018
172018
Approximate stochastic dynamic programming for hydroelectric production planning
L Zéphyr, P Lang, BF Lamond, P Côté
European journal of operational research 262 (2), 586-601, 2017
162017
Scenario-tree modeling for stochastic short-term hydropower operations planning
S Séguin, C Audet, P Côté
Journal of Water Resources Planning and Management 143 (12), 04017073, 2017
122017
Multivariate recurrence plots for visualizing and quantifying the dynamics of spatially extended ecosystems
R Proulx, P Côté, L Parrott
ecological complexity 6 (1), 37-47, 2009
122009
Use of recurrence analysis to measure the dynamical stability of a multi-species community model
R Proulx, P Côté, L Parrott
The European Physical Journal Special Topics 164 (1), 117-126, 2008
122008
Analysis of the effects of biases in ensemble streamflow prediction (ESP) forecasts on electricity production in hydropower reservoir management
R Arsenault, P Côté
Hydrology and Earth System Sciences 23 (6), 2735-2750, 2019
92019
Rio Tinto Alcan AP4X low energy cell development
P Thibeault, S Bécasse, A Blais, P Côté, L Fiot, F Laflamme
Light Metals 2013, 543-547, 2003
92003
Comparing model-based and model-free streamflow simulation approaches to improve hydropower reservoir operations
Q Desreumaux, P Côté, R Leconte
Journal of Water Resources Planning and Management 144 (3), 05018002, 2018
82018
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20