| Neural networks as tools in construction O Moselhi, T Hegazy, P Fazio Journal of construction engineering and management 117 (4), 606-625, 1991 | 236 | 1991 |
| Integrating 3D laser scanning and photogrammetry for progress measurement of construction work S El-Omari, O Moselhi Automation in construction 18 (1), 1-9, 2008 | 199 | 2008 |
| Project-network analysis using fuzzy sets theory P Lorterapong, O Moselhi Journal of Construction Engineering and Management 122 (4), 308-318, 1996 | 186 | 1996 |
| Developing practical neural network applications using backāpropagation T Hegazy, P Fazio, O Moselhi ComputerāAided Civil and Infrastructure Engineering 9 (2), 145-159, 1994 | 172 | 1994 |
| Optimizing resource utilization for repetitive construction projects K El-Rayes, O Moselhi Journal of Construction Engineering and Management 127 (1), 18-27, 2001 | 164 | 2001 |
| Change orders impact on labor productivity O Moselhi, I Assem, K El-Rayes Journal of Construction Engineering and Management 131 (3), 354-359, 2005 | 156 | 2005 |
| Scheduling of repetitive projects with cost optimization O Moselhi, K El-Rayes Journal of Construction Engineering and Management 119 (4), 681-697, 1993 | 137 | 1993 |
| Multiobjective optimization of earthmoving operations M Marzouk, O Moselhi Journal of construction Engineering and Management 130 (1), 105-113, 2004 | 132 | 2004 |
| Resource-driven scheduling of repetitive activities K El-Rayes, O Moselhi Construction management & economics 16 (4), 433-446, 1998 | 132 | 1998 |
| DBID: analogy-based DSS for bidding in construction O Moselhi, T Hegazy, P Fazio Journal of Construction Engineering and Management 119 (3), 466-479, 1993 | 127 | 1993 |
| Impact of rainfall on the productivity of highway construction K El-Rayes, O Moselhi Journal of construction engineering and management 127 (2), 125-131, 2001 | 126 | 2001 |
| Analogy-based solution to markup estimation problem T Hegazy, O Moselhi Journal of Computing in Civil Engineering 8 (1), 72-87, 1994 | 124 | 1994 |
| Integrating automated data acquisition technologies for progress reporting of construction projects S El-Omari, O Moselhi Automation in Construction 20 (6), 699-705, 2011 | 123 | 2011 |
| Image-based retrieval of concrete crack properties for bridge inspection RS Adhikari, O Moselhi, A Bagchi Automation in construction 39, 180-194, 2014 | 122 | 2014 |
| Schedule compression using the direct stiffness method O Moselhi Canadian Journal of Civil Engineering 20 (1), 65-72, 1993 | 118 | 1993 |
| RFID indoor location identification for construction projects A Montaser, O Moselhi Automation in Construction 39, 167-179, 2014 | 106 | 2014 |
| Object-oriented simulation model for earthmoving operations M Marzouk, O Moselhi Journal of construction engineering and management 129 (2), 173-181, 2003 | 105 | 2003 |
| Optimization algorithm for selection and on site location of mobile cranes M Al-Hussein, S Alkass, O Moselhi Journal of construction engineering and management 131 (5), 579-590, 2005 | 102 | 2005 |
| Classification of defects in sewer pipes using neural networks O Moselhi, T Shehab-Eldeen Journal of infrastructure systems 6 (3), 97-104, 2000 | 98 | 2000 |
| Optimization of earthmoving operations in heavy civil engineering projects O Moselhi, A Alshibani Journal of Construction Engineering and Management 135 (10), 948-954, 2009 | 93 | 2009 |