Suivre
Christina Burt
Christina Burt
Computing and Information Systems, The University of Melbourne
Adresse e-mail validée de ms.unimelb.edu.au - Page d'accueil
Titre
Citée par
Citée par
Année
Corrigendum: Match factor for heterogeneous truck and loader fleets
C Burt, L Caccetta
International Journal of Mining, Reclamation and Environment 22 (1), 84-85, 2008
172*2008
Equipment selection for surface mining: a review
CN Burt, L Caccetta
Interfaces 44 (2), 143-162, 2014
1342014
Equipment selection for mining: with case studies
CN Burt, L Caccetta
Springer International Publishing, 2018
632018
Models for Mining Equipment Selection
C Burt, L Caccetta, S Hill, P Welgama
MODSIM 2005 International Congress on Modelling and Simulation, 170-176, 2005
62*2005
An optimisation approach to materials handling in surface mines
CN Burt
Curtin University of Technology., 2008
582008
Equipment selection with heterogeneous fleets for multiple-period schedules
C Burt, L Caccetta, P Welgama, L Fouché
Journal of the Operational Research Society 62 (8), 1498-1509, 2011
292011
A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
ML Blom, CN Burt, AR Pearce, PJ Stuckey
INFORMS Journal on Computing 26 (4), 658-676, 2014
242014
Planning for mining operations with time and resource constraints
N Lipovetzky, C Burt, A Pearce, P Stuckey
Proceedings of the International Conference on Automated Planning and …, 2014
242014
An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies
C Burt, L Caccetta, L Fouché, P Welgama
Journal of Industrial and Management Optimization, 2013
182013
Scheduling with fixed maintenance, shared resources and nonlinear feedrate constraints: A mine planning case study
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Integration of AI and OR Techniques in Constraint Programming: 12th …, 2015
92015
Equipment Selection for Surface Mining: A Review
L Cacceta, C Burt
Journal Interface 44 (2), 143-162, 2013
92013
Caccetta, l.(2008).“Match factor for heterogeneous truck and loader fleets
C Burt
International journal of mining, reclamation and Enviroment, 0
5
Approximate Uni-directional Benders Decomposition
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Planning, Search and Optimization Workshop: AAAI 2015, 2014
42014
Delivering on delivery: Optimisation and the future of vehicle routing
C Burt, P Hart, D Petrova, A West
Operations Research Proceedings 2017: Selected Papers of the Annual …, 2018
32018
Scheduling Tools for Open-Pit Mining Operations
M Blom, C Burt, N Lipovetzky, A Pearce, P Stuckey
ICAPS-15 Sysdemo, 2015
32015
Exact Models for the k-Connected Minimum Energy Problem
C Burt, Y Chan, N Sonenberg
Ad Hoc Networks: First International Conference, ADHOCNETS 2009, Niagara …, 2010
32010
Generating explanations for mathematical optimisation: Solution framework and case study
C Burt, K Klimova, B Primas
ICAPS 2018 Workshop on Explainable Planning (XAIP), 2018
22018
Erratum to: Equipment Selection for Mining: With Case Studies
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, E1-E1, 2018
22018
Methodology: Preliminaries and background
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, 11-23, 2018
22018
Accurate costing in mixed integer utilisation mining models
C Burt, Y Chan
18th World IMACS Congress and MODSIM09 International Congress On Modelling …, 2009
22009
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20