Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times A Mozdgir, SMT Fatemi Ghomi, F Jolai, J Navaei International Journal of Production Research 51 (12), 3625-3642, 2013 | 77 | 2013 |
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs J Navaei, SMTF Ghomi, F Jolai, A Mozdgir Computers & Operations Research 44, 52-65, 2014 | 45 | 2014 |
Two-stage flow-shop scheduling problem with non-identical second stage assembly machines J Navaei, SMTF Ghomi, F Jolai, ME Shiraqai, H Hidaji The international journal of advanced manufacturing technology 69, 2215-2226, 2013 | 30 | 2013 |
Grouping part/product variants based on networked operations sequence J Navaei, H ElMaraghy Journal of Manufacturing Systems 38, 63-76, 2016 | 28 | 2016 |
Grouping product variants based on alternate machines for each operation J Navaei, H ElMaraghy Procedia Cirp 17, 61-66, 2014 | 17 | 2014 |
Three meta-heuristics to solve the no-wait two-stage assembly flow shop scheduling problem A Mozdgir, SMT Fatemi Ghomi, F Jolai, J Navaei Scientia Iranica 20 (6), 2275-2283, 2013 | 15 | 2013 |
Optimal operations sequence retrieval from master operations sequence for part/product families J Navaei, H ElMaraghy International Journal of Production Research 56 (1-2), 140-163, 2018 | 13 | 2018 |
Grouping and sequencing product variants based on setup similarity J Navaei, H ElMaraghy International Journal of Computer Integrated Manufacturing 30 (6), 664-676, 2017 | 7 | 2017 |
Two-stage assembly flow-shop scheduling problem with bi-objective of number of tardy and makespan minimization J Navaei, A Mozdgir, H Hidaji In: Proceedings of the 2010 International Conference on Artificial …, 2010 | 6 | 2010 |
An intelligent image processing-based approach to optimize vehicle headlamp aiming J Navaei, M Babakmehr, R Kalamdani, YN Liu, S Qiu, J Farhan, J Blackful 2021 18th International Multi-Conference on Systems, Signals & Devices (SSD …, 2021 | 2 | 2021 |
A Novel Optimization Model for Equipment Capacity Planning with Total Number of Assets and Changeover Minimization J Navaei, B Maxwell, N Hassan, R Kalamdani, R Austin SAE Technical Paper, 2021 | 1 | 2021 |
Minimizing backtracking distance for networked operations in smart manufacturing J Navaei, H ElMaraghy International Journal of Computer Integrated Manufacturing 34 (5), 515-531, 2021 | 1 | 2021 |
An Optimization Model for Die Sets Allocation to Minimize Supply Chain Cost A Abolhassani, J Navaei, N Hassan, E Solecki, T Mooney SAE Technical Paper, 2022 | | 2022 |
Variant-oriented Planning Models for Parts/Products Grouping, Sequencing and Operations J Navaei University of Windsor (Canada), 2016 | | 2016 |
Designing a semi-obnoxious production-distribution network M Pazoki, J Navaei, K Fahimi, H Hidaji In: Proceedings of the 16th Annual International Conference on Industrial …, 2011 | | 2011 |
A benders decomposition approach for a production-distribution network design problem AHZ Anaraki, M Jeihoonian, M Pazoki, J Navaei In: Proceeding of 41th International Conference on Computers & Industrial …, 2011 | | 2011 |