Follow
Javad Navaei
Title
Cited by
Cited by
Year
Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
A Mozdgir, SMT Fatemi Ghomi, F Jolai, J Navaei
International Journal of Production Research 51 (12), 3625-3642, 2013
772013
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs
J Navaei, SMTF Ghomi, F Jolai, A Mozdgir
Computers & Operations Research 44, 52-65, 2014
452014
Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
J Navaei, SMTF Ghomi, F Jolai, ME Shiraqai, H Hidaji
The international journal of advanced manufacturing technology 69, 2215-2226, 2013
302013
Grouping part/product variants based on networked operations sequence
J Navaei, H ElMaraghy
Journal of Manufacturing Systems 38, 63-76, 2016
282016
Grouping product variants based on alternate machines for each operation
J Navaei, H ElMaraghy
Procedia Cirp 17, 61-66, 2014
172014
Three meta-heuristics to solve the no-wait two-stage assembly flow shop scheduling problem
A Mozdgir, SMT Fatemi Ghomi, F Jolai, J Navaei
Scientia Iranica 20 (6), 2275-2283, 2013
152013
Optimal operations sequence retrieval from master operations sequence for part/product families
J Navaei, H ElMaraghy
International Journal of Production Research 56 (1-2), 140-163, 2018
132018
Grouping and sequencing product variants based on setup similarity
J Navaei, H ElMaraghy
International Journal of Computer Integrated Manufacturing 30 (6), 664-676, 2017
72017
Two-stage assembly flow-shop scheduling problem with bi-objective of number of tardy and makespan minimization
J Navaei, A Mozdgir, H Hidaji
In: Proceedings of the 2010 International Conference on Artificial …, 2010
62010
An intelligent image processing-based approach to optimize vehicle headlamp aiming
J Navaei, M Babakmehr, R Kalamdani, YN Liu, S Qiu, J Farhan, J Blackful
2021 18th International Multi-Conference on Systems, Signals & Devices (SSD …, 2021
22021
A Novel Optimization Model for Equipment Capacity Planning with Total Number of Assets and Changeover Minimization
J Navaei, B Maxwell, N Hassan, R Kalamdani, R Austin
SAE Technical Paper, 2021
12021
Minimizing backtracking distance for networked operations in smart manufacturing
J Navaei, H ElMaraghy
International Journal of Computer Integrated Manufacturing 34 (5), 515-531, 2021
12021
An Optimization Model for Die Sets Allocation to Minimize Supply Chain Cost
A Abolhassani, J Navaei, N Hassan, E Solecki, T Mooney
SAE Technical Paper, 2022
2022
Variant-oriented Planning Models for Parts/Products Grouping, Sequencing and Operations
J Navaei
University of Windsor (Canada), 2016
2016
Designing a semi-obnoxious production-distribution network
M Pazoki, J Navaei, K Fahimi, H Hidaji
In: Proceedings of the 16th Annual International Conference on Industrial …, 2011
2011
A benders decomposition approach for a production-distribution network design problem
AHZ Anaraki, M Jeihoonian, M Pazoki, J Navaei
In: Proceeding of 41th International Conference on Computers & Industrial …, 2011
2011
The system can't perform the operation now. Try again later.
Articles 1–16