Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects C Liu, M Lu Journal of construction engineering and management 141 (3), 04014082, 2015 | 39 | 2015 |
Data-driven simulation-based analytics for heavy equipment life-cycle cost C Liu, S AbouRizk, D Morley, Z Lei Journal of Construction Engineering and Management 146 (5), 04020038, 2020 | 19 | 2020 |
Equipment logistics performance measurement using data-driven social network analysis C Liu, W Ji, SM AbouRizk, MFF Siu Journal of Construction Engineering and Management 145 (5), 04019033, 2019 | 14 | 2019 |
Simulation and optimization of temporary road network in mass earthmoving projects C Liu, M Lu, S Johnson 2013 Winter Simulations Conference (WSC), 3181-3190, 2013 | 14 | 2013 |
Dynamic, data-driven decision-support approach for construction equipment acquisition and disposal C Liu, Z Lei, D Morley, SM AbouRizk Journal of Computing in Civil Engineering 34 (2), 04019053, 2020 | 13 | 2020 |
Optimizing earthwork hauling plan with minimum cost flow network D Li, C Liu, M Lu | 10 | 2015 |
Operation effort optimization for planning performance-based snow-removal projects MFF Siu, C Liu, R Wales, S AbouRizk Journal of Computing in Civil Engineering 31 (6), 04017060, 2017 | 7 | 2017 |
Optimization of Temporary Haul Road Design and Earthmoving Job Planning based on Site Rough-grading Design C Liu | 6 | 2014 |
Crew cost and productivity performance benchmarking based on commercial cost estimating databases M Lu, C Liu Construction Research Congress 2014: Construction in a Global Network, 1713-1722, 2014 | 4 | 2014 |
Analysis of prompt payment discounts in construction R Al-Hussein, C Liu, M Liu, Y Su, G Lucko Proceedings of the 4th Construction Specialty Conference at the Canadian …, 2013 | 3 | 2013 |
A Predictive Simulation Model of Regional Weather Events for Winter Road Maintenance Operations Y Li, C Liu, Z Lei, S Abourizk Construction Research Congress 2020, 856-865, 2020 | | 2020 |
Data-Driven Strategies to Improve the Construction Equipment Management C Liu | | 2020 |
Markov Chain-based Long-term Prediction of Equipment Usage hours from Historical Data C Liu, M Ali, S AbouRizk CSCE 2018 Annual Conference in Fredericton, 2018 | | 2018 |