M. Fatih Tasgetiren
Title
Cited by
Cited by
Year
Differential evolution algorithm with ensemble of parameters and mutation strategies
R Mallipeddi, PN Suganthan, QK Pan, MF Tasgetiren
Applied soft computing 11 (2), 1679-1696, 2011
10252011
A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
MF Tasgetiren, YC Liang, M Sevkli, G Gencyilmaz
European journal of operational research 177 (3), 1930-1947, 2007
6172007
A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem
QK Pan, MF Tasgetiren, PN Suganthan, TJ Chua
Information sciences 181 (12), 2455-2468, 2011
5972011
A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
QK Pan, MF Tasgetiren, YC Liang
Computers & Operations Research 35 (9), 2807-2839, 2008
5142008
A self-adaptive global best harmony search algorithm for continuous optimization problems
QK Pan, PN Suganthan, MF Tasgetiren, JJ Liang
Applied Mathematics and Computation 216 (3), 830-848, 2010
4072010
A discrete differential evolution algorithm for the permutation flowshop scheduling problem
QK Pan, MF Tasgetiren, YC Liang
Computers & Industrial Engineering 55 (4), 795-816, 2008
3102008
A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops
MF Tasgetiren, QK Pan, PN Suganthan, AHL Chen
Information sciences 181 (16), 3459-3475, 2011
2402011
Particle swarm optimization algorithm for single machine total weighted tardiness problem
MF Tasgetiren, M Sevkli, YC Liang, G Gençyilmaz
Proceedings of the 2004 Congress on Evolutionary Computation (IEEE Cat. No …, 2004
2292004
Dynamic multi-swarm particle swarm optimizer with local search for large scale global optimization
SZ Zhao, JJ Liang, PN Suganthan, MF Tasgetiren
2008 IEEE Congress on Evolutionary Computation (IEEE World Congress on …, 2008
2072008
A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
JQ Li, QK Pan, MF Tasgetiren
Applied Mathematical Modelling 38 (3), 1111-1132, 2014
1912014
Particle swarm optimization algorithm for permutation flowshop sequencing problem
MF Tasgetiren, M Sevkli, YC Liang, G Gencyilmaz
International Workshop on Ant Colony Optimization and Swarm Intelligence …, 2004
1682004
A binary particle swarm optimization algorithm for lot sizing problem
MF Taşgetiren, YC Liang
Journal of Economic and Social Research 5 (2), 1-20, 2003
1582003
Minimizing the total flow time in a flow shop with blocking by using hybrid harmony search algorithms
L Wang, QK Pan, MF Tasgetiren
Expert Systems with Applications 37 (12), 7929-7936, 2010
1392010
A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem
L Wang, QK Pan, MF Tasgetiren
Computers & Industrial Engineering 61 (1), 76-83, 2011
1322011
Dynamic multi-swarm particle swarm optimizer with harmony search
SZ Zhao, PN Suganthan, QK Pan, MF Tasgetiren
Expert Systems with Applications 38 (4), 3735-3742, 2011
1292011
An ensemble of discrete differential evolution algorithms for solving the generalized traveling salesman problem
MF Tasgetiren, PN Suganthan, QK Pan
Applied Mathematics and Computation 215 (9), 3356-3368, 2010
1232010
A multi-populated differential evolution algorithm for solving constrained optimization problem
MF Tasgetiren, PN Suganthan
2006 IEEE International Conference on Evolutionary Computation, 33-40, 2006
1192006
A discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup times
MF Tasgetiren, QK Pan, YC Liang
Computers & Operations Research 36 (6), 1900-1915, 2009
1152009
Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem
M Fatih Tasgetiren, YC Liang, M Sevkli, G Gencyilmaz
International Journal of Production Research 44 (22), 4737-4754, 2006
1072006
A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem
QK Pan, PN Suganthan, JJ Liang, MF Tasgetiren
Expert Systems with Applications 38 (4), 3252-3259, 2011
1042011
The system can't perform the operation now. Try again later.
Articles 1–20