Yu-Yan Han
Yu-Yan Han
School of Information and Electrical Engineering, China University of Mining and Technology
Verified email at cumt.edu.cn
Title
Cited by
Cited by
Year
Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions
J Li, H Sang, Y Han, C Wang, K Gao
Journal of Cleaner Production 181, 584-598, 2018
1362018
A discrete artificial bee colony algorithm incorporating differential evolution for flow shop scheduling problem with blocking
YYHD Gong
Engineering Optimization, 2014
812014
A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems
K Gao, Z Cao, L Zhang, Z Chen, Y Han, Q Pan
IEEE/CAA Journal of Automatica Sinica 6 (4), 904-916, 2019
782019
A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems
D Gong, Y Han, J Sun
Knowledge-Based Systems 148, 115-130, 2018
742018
Evolutionary multiobjective blocking lot-streaming flow shop scheduling with machine breakdowns
Y Han, D Gong, Y Jin, Q Pan
IEEE transactions on cybernetics 49 (1), 184-197, 2017
712017
Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time
Y Han, D Gong, Y Jin, Q Pan
Applied Soft Computing 42, 229-245, 2016
582016
An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem
YYHDGXSQ Pan
International Journal of Production Research 52 (8), 2211-2231, 2014
572014
An improved artificial bee colony algorithm for the blocking flowshop scheduling problem
YY Han, QK Pan, JQ Li, H Sang
The International Journal of Advanced Manufacturing Technology 60 (9-12 …, 2012
502012
Solving the blocking flow shop scheduling problem with makespan using a modified fruit fly optimisation algorithm
Y Han, D Gong, J Li, Y Zhang
International Journal of Production Research 54 (22), 6782-6797, 2016
462016
Effective hybrid discrete artificial bee colony algorithms for the total flow time minimization in the blocking flow shop problem
YYHJLQPJ Li
International Journal of Advanced Manufacturing Technology 67, 397-414, 2013
462013
Effective invasive weed optimization algorithms for distributed assembly permutation flowshop problem with total flowtime criterion
HY Sang, QK Pan, JQ Li, P Wang, YY Han, KZ Gao, P Duan
Swarm and evolutionary computation 44, 64-73, 2019
382019
Hybrid artificial bee colony algorithm for a parallel batching distributed flow-shop problem with deteriorating jobs
JQ Li, MX Song, L Wang, PY Duan, YY Han, HY Sang, QK Pan
IEEE Transactions on Cybernetics 50 (6), 2425-2439, 2019
352019
An improved artificial bee colony algorithm for addressing distributed flow shop with distance coefficient in a prefabricated system
J Li, SC Bai, P Duan, H Sang, Y Han, Z Zheng
International Journal of Production Research 57 (22), 6922-6942, 2019
332019
A set-based genetic algorithm for solving the many-objective optimization problem
DGGWXSYY Han
Soft Computing, 2014
302014
Efficient multi-objective algorithm for the lot-streaming hybrid flowshop with variable sub-lots
J Li, X Tao, B Jia, Y Han, C Liu, P Duan, Z Zheng, H Sang
Swarm and Evolutionary Computation 52, 100600, 2020
212020
Multi-objective migrating birds optimization algorithm for stochastic lot-streaming flow shop scheduling with blocking
Y Han, JQ Li, D Gong, H Sang
IEEE Access 7, 5946-5962, 2018
202018
A hybrid Pareto-based tabu search for the distributed flexible job shop scheduling problem with E/T criteria
JQ Li, P Duan, J Cao, XP Lin, YY Han
IEEE Access 6, 58883-58897, 2018
162018
Apply the discrete artificial bee colony algorithm to the blocking flow shop problem with makespan criterion
YY Han, JH Duan, M Zhang
2011 Chinese Control and Decision Conference (CCDC), 2131-2135, 2011
162011
Meta-heuristic algorithm for solving vehicle routing problems with time windows and synchronized visit constraints in prefabricated systems
J Li, Y Han, P Duan, Y Han, B Niu, C Li, Z Zheng, Y Liu
Journal of Cleaner Production 250, 119464, 2020
142020
An improved Jaya algorithm for solving the flexible job shop scheduling problem with transportation and setup times
J Li, J Deng, C Li, Y Han, J Tian, B Zhang, C Wang
Knowledge-Based Systems, 106032, 2020
62020
The system can't perform the operation now. Try again later.
Articles 1–20