Follow
Ashtad Javanmardi
Ashtad Javanmardi
FDH Infrastructure Services, North Carolina State University
Verified email at ncsu.edu - Homepage
Title
Cited by
Cited by
Year
Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
P Ghoddousi, E Eshtehardian, S Jooybanpour, A Javanmardi
Automation in construction 30, 216-227, 2013
2322013
Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning
A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang
Journal of Management in Engineering 34 (2), 04017062, 2018
412018
How does experience with delay shape managers’ making-do decision: Random forest approach
YX Zhang, A Javanmardi, YC Liu, SJ Yang, XX Yu, SM Hsiang, ZH Jiang, ...
Journal of Management in Engineering 36 (4), 04020030, 2020
152020
Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach
A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang
Journal of construction engineering and management 146 (4), 04020015, 2020
92020
Motivating reliable collaboration for modular construction: Shapley value–based smart contract
G Chen, M Liu, H Li, SM Hsiang, A Jarvamard
Journal of Management in Engineering 39 (6), 04023042, 2023
82023
Schedules and schedulers: A study in the US construction industry
TCL Alves, M Liu, NM Scala, A Javanmardi
Engineering management journal 32 (3), 166-185, 2020
82020
Comparative study on perception of causes for construction task delay in China and the United States
YC Liu, A Jarvamardi, YX Zhang, M Liu, SM Hsiang, SJ Yang, XX Yu, ...
Journal of Construction Engineering and Management 147 (3), 04020176, 2021
72021
Constraint Removal and Work Plan Reliability: A Bridge Project Case Study
A Javanmardi, SA Abbasian-Hosseini, SM Hsiang, M Liu
26th Annual Conference of the International Group for Lean Construction …, 2018
72018
Knowing what is going on—A smart contract for modular construction
G Chen, H Li, M Liu, SM Hsiang, A Jarvamardi
Canadian Journal of Civil Engineering 50 (3), 210-223, 2022
62022
Analysis of Workflow Variability's Impacts on Trade and Project Performance
A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang
Procedia Engineering 145, 281-287, 2016
62016
Situation awareness based smart contract for modular construction
H Li, G Chen, M Liu, SM Hsiang, A Jarvamardi
Canadian Society of Civil Engineering Annual Conference, 363-373, 2021
42021
Manager Perception and Decision for Making-Do in China v.s. in the U.S.
A Javanmardi, YX Zhang, YC Liu, XX Yu, M Liu, S Hsiang
27th Annual Conference of the International Group for Lean Construction …, 2019
32019
Enhancing construction project workflow reliability through observe–plan–do–check–react cycle: A bridge project case study
A Javanmardi, C He, SM Hsiang, SA Abbasian-Hosseini, M Liu
Buildings 13 (9), 2379, 2023
22023
Strategies and predictive models for reducing workflow variability in construction production systems
A Javanmardi
North Carolina State University, 2019
12019
Effects of General Contractor’s Loading Strategies on Project and Trades’ Performance
A Javanmardi, SM Hsiang, M Liu
Construction Research Congress 2018, 449-459, 2018
2018
Resource-constrained project time-cost optimization using genetic algorithm
A Javanmardi, E Eshtehardian, P Ghoddousi
6th National Congress of Civil Engineering, Semnan, Iran, 2011
2011
GA-based Approach to Time-Cost Trade-off Problem in Resource-constrained Projects
A Javanmardi, P Ghoddousi, E Eshtehardian
6th International Project Management Conference, Tehran, Iran, 2011
2011
Optimization of Earthmoving Operations Considering Inflation Rate
E Eshtehardian, M Alipour, A Javanmardi
5th International Project Management Conference, Tehran, Iran, 2009
2009
Improving Construction Meeting Effectiveness: A Trade-Off between Reactive and Proactive Site-Level Planning Discussions
A Javanmardi, C He, S Hsiang, SA Abbasian-Hosseini, M Liu
Available at SSRN 4608783, 0
The system can't perform the operation now. Try again later.
Articles 1–19