Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm P Ghoddousi, E Eshtehardian, S Jooybanpour, A Javanmardi Automation in construction 30, 216-227, 2013 | 232 | 2013 |
Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang Journal of Management in Engineering 34 (2), 04017062, 2018 | 41 | 2018 |
How does experience with delay shape managers’ making-do decision: Random forest approach YX Zhang, A Javanmardi, YC Liu, SJ Yang, XX Yu, SM Hsiang, ZH Jiang, ... Journal of Management in Engineering 36 (4), 04020030, 2020 | 15 | 2020 |
Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang Journal of construction engineering and management 146 (4), 04020015, 2020 | 9 | 2020 |
Motivating reliable collaboration for modular construction: Shapley value–based smart contract G Chen, M Liu, H Li, SM Hsiang, A Jarvamard Journal of Management in Engineering 39 (6), 04023042, 2023 | 8 | 2023 |
Schedules and schedulers: A study in the US construction industry TCL Alves, M Liu, NM Scala, A Javanmardi Engineering management journal 32 (3), 166-185, 2020 | 8 | 2020 |
Comparative study on perception of causes for construction task delay in China and the United States YC Liu, A Jarvamardi, YX Zhang, M Liu, SM Hsiang, SJ Yang, XX Yu, ... Journal of Construction Engineering and Management 147 (3), 04020176, 2021 | 7 | 2021 |
Constraint Removal and Work Plan Reliability: A Bridge Project Case Study A Javanmardi, SA Abbasian-Hosseini, SM Hsiang, M Liu 26th Annual Conference of the International Group for Lean Construction …, 2018 | 7 | 2018 |
Knowing what is going on—A smart contract for modular construction G Chen, H Li, M Liu, SM Hsiang, A Jarvamardi Canadian Journal of Civil Engineering 50 (3), 210-223, 2022 | 6 | 2022 |
Analysis of Workflow Variability's Impacts on Trade and Project Performance A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang Procedia Engineering 145, 281-287, 2016 | 6 | 2016 |
Situation awareness based smart contract for modular construction H Li, G Chen, M Liu, SM Hsiang, A Jarvamardi Canadian Society of Civil Engineering Annual Conference, 363-373, 2021 | 4 | 2021 |
Manager Perception and Decision for Making-Do in China v.s. in the U.S. A Javanmardi, YX Zhang, YC Liu, XX Yu, M Liu, S Hsiang 27th Annual Conference of the International Group for Lean Construction …, 2019 | 3 | 2019 |
Enhancing construction project workflow reliability through observe–plan–do–check–react cycle: A bridge project case study A Javanmardi, C He, SM Hsiang, SA Abbasian-Hosseini, M Liu Buildings 13 (9), 2379, 2023 | 2 | 2023 |
Strategies and predictive models for reducing workflow variability in construction production systems A Javanmardi North Carolina State University, 2019 | 1 | 2019 |
Effects of General Contractor’s Loading Strategies on Project and Trades’ Performance A Javanmardi, SM Hsiang, M Liu Construction Research Congress 2018, 449-459, 2018 | | 2018 |
Resource-constrained project time-cost optimization using genetic algorithm A Javanmardi, E Eshtehardian, P Ghoddousi 6th National Congress of Civil Engineering, Semnan, Iran, 2011 | | 2011 |
GA-based Approach to Time-Cost Trade-off Problem in Resource-constrained Projects A Javanmardi, P Ghoddousi, E Eshtehardian 6th International Project Management Conference, Tehran, Iran, 2011 | | 2011 |
Optimization of Earthmoving Operations Considering Inflation Rate E Eshtehardian, M Alipour, A Javanmardi 5th International Project Management Conference, Tehran, Iran, 2009 | | 2009 |
Improving Construction Meeting Effectiveness: A Trade-Off between Reactive and Proactive Site-Level Planning Discussions A Javanmardi, C He, S Hsiang, SA Abbasian-Hosseini, M Liu Available at SSRN 4608783, 0 | | |