Claver Diallo
TitleCited byYear
State of the art review of quality, reliability and maintenance issues in closed-loop supply chains with remanufacturing
C Diallo, U Venkatadri, A Khatab, S Bhakthavatchalam
International Journal of Production Research 55 (5), 1277 - 1296, 2017
432017
Developing a bi-objective model of the closed-loop supply chain network with green supplier selection and disassembly of products: The impact of parts reliability and product …
S Ghayebloo, MJ Tarokh, U Venkatadri, C Diallo
Journal of Manufacturing Systems 36, 76-86, 2015
272015
Optimal unlimited free-replacement warranty strategy using reconditioned products
N Chari, C Diallo, U Venkatadri
International Journal of Performability Engineering 9 (2), 191-200, 2013
262013
Selective maintenance optimization for series-parallel systems alternating missions and scheduled breaks with stochastic durations
A Khatab, EH Aghezzaf, C Diallo, I Djelloul
International Journal of Production Research 55 (10), 3008 - 3024, 2017
24*2017
Makespan minimization for parallel machines scheduling with multiple availability constraints
N Hashemian, C Diallo, B Vizvári
Annals of Operations Research 213 (1), 173-186, 2014
202014
(s, Q) Spare parts provisioning strategy for periodically replaced systems
C Diallo, D Ait-Kadi, A Chelbi
IEEE Transactions on Reliability 57 (1), 134-139, 2008
192008
Optimal selective maintenance decisions for large serial k-out-of-n:G systems under imperfect maintenance
C Diallo, U Venkatadri, A Khatab, Z Liu
Reliability Engineering & System Safety 175 (C), 234-245, 2018
142018
Optimal opportunistic indirect grouping of preventive replacements in multicomponent systems
EA Gunn, C Diallo
Computers & Industrial Engineering 90, 281-291, 2015
112015
Modeling and analysis of a warranty policy using new and reconditioned parts
N Chari, C Diallo, U Venkatadri, A Khatab
Applied Stochastic Models in Business and Industry 32, 539-553, 2016
102016
Integrated spare parts management
C Diallo, D Ait-Kadi, A Chelbi
Handbook of Maintenance Management and Engineering, 191-222, 2009
102009
Optimizing upgrade and imperfect preventive maintenance in failure-prone second-hand systems
A Khatab, C Diallo, IB Sidibe
Journal of Manufacturing Systems 43 (1), 58-78, 2017
92017
State of the Art on Performability across the Sustainable Value Chain.
N CHARI, C DIALLO, U VENKATADRI
International Journal of Performability Engineering 10 (6), 2014
72014
Production planning in the presence of remanufactured spare components: an application in the airline industry
N Chari, C Diallo, U Venkatadri, D Ait-Kadi
The International Journal of Advanced Manufacturing Technology, 1-12, 2016
62016
Kernel estimator of maintenance optimization model for a stochastically degrading system under different operating environments
IB Sidibé, A Khatab, C Diallo, KH Adjallah
Reliability Engineering & System Safety 147, 109-116, 2016
62016
Reliability analysis and optimal mixture strategy for a lot composed of new and reconditioned systems
C Diallo, D Ait-Kadi, U Venkatadri
International Journal of Performability Engineering 10 (6), 557-566, 2014
62014
Spare parts identification and provisioning models
D Aät-Kadi, C Diallo, A Chelbi
Journal of decision systems 12 (1), 47-65, 2003
62003
Quality, Reliability, Maintenance Issues in Closed-Loop Supply Chains: A Review
S Bhakthavatchalam, C Diallo, U Venkatadri, A Khatab
IFAC-PapersOnLine 48 (3), 460-465, 2015
52015
Optimal mixture strategy of two identical subpopulations with different ages
C Diallo, D Aït-Kadi
International Conference on Industrial Engineering and Systems Management …, 2011
52011
Développement d'un modèle d'identification et de gestion des pièces de rechange
C Diallo
52006
Optimization of the joint selective maintenance and repairperson assignment problem under imperfect maintenance
A Khatab, C Diallo, U Venkatadri, Z Liu, EH Aghezzaf
Computers & Industrial Engineering 125, 413-422, 2018
42018
The system can't perform the operation now. Try again later.
Articles 1–20