Mixed integer linear programming formulations for open pit production scheduling H Askari-Nasab, Y Pourrahimian, E Ben-Awuah, S Kalantari Journal of Mining Science 47, 338-359, 2011 | 138 | 2011 |
Modified Kuz—Ram fragmentation model and its use at the Sungun Copper Mine S Gheibie, H Aghababaei, SH Hoseinie, Y Pourrahimian International Journal of Rock Mechanics and Mining Sciences 46 (6), 967-973, 2009 | 132 | 2009 |
Strategic mining options optimization: Open pit mining, underground mining or both E Ben-Awuah, O Richter, T Elkington, Y Pourrahimian International Journal of Mining Science and Technology 26 (6), 1065-1071, 2016 | 130 | 2016 |
Development of a new classification system for assessing of rock mass drillability index (RDi) SH Hoseinie, H Aghababaei, Y Pourrahimian International Journal of Rock Mechanics and Mining Sciences 45 (1), 1-10, 2008 | 119 | 2008 |
A multi-step approach for block-cave production scheduling optimization P Yashar, AN Hooman International Journal of Mining Science and Technology 23 (5), 739-750, 2013 | 69 | 2013 |
Comparison of chemical suppressants under different atmospheric temperatures for the control of fugitive dust emission on mine hauls roads D Omane, WV Liu, Y Pourrahimian Atmospheric Pollution Research 9 (3), 561-568, 2018 | 56 | 2018 |
Mathematical programming applications in block-caving scheduling: a review of models and algorithms F Khodayari, Y Pourrahimian Int. J. Mining and Mineral Engineering 6 (3), 234-257, 2015 | 43 | 2015 |
A systematic review of artificial intelligence and data-driven approaches in strategic open-pit mine planning R Noriega, Y Pourrahimian Resources Policy 77, 102727, 2022 | 40 | 2022 |
Mixed–Integer Linear Programming formulation for block–cave sequence optimisation Y Pourrahimian, H Askari–Nasab, D Tannant International Journal of Mining and Mineral Engineering 4 (1), 26-49, 2012 | 40 | 2012 |
Mathematical programming for sequence optimization in block cave mining Y Pourrahimian University of Alberta (Canada), 2013 | 38 | 2013 |
A 3D approximate hybrid algorithm for stope boundary optimization V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian Computers & Operations Research 115, 104475, 2020 | 34 | 2020 |
Effects of fibers on expansive shotcrete mixtures consisting of calcium sulfoaluminate cement, ordinary Portland cement, and calcium sulfate H Yu, L Wu, WV Liu, Y Pourrahimian Journal of rock mechanics and geotechnical engineering 10 (2), 212-221, 2018 | 34 | 2018 |
Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying M Shamsi, Y Pourrahimian, M Rahmanpour International Journal of Mining, Reclamation and Environment 36 (2), 142-158, 2022 | 23 | 2022 |
An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation Y Pourrahimian, H Askari-Nasab Mining Technology 123 (3), 162-172, 2014 | 23 | 2014 |
Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling F Nezhadshahmohammad, Y Pourrahimian, H Aghababaei International Journal of Mining Science and Technology 28 (6), 941-950, 2018 | 21 | 2018 |
Hierarchical mine production scheduling using discrete-event simulation E Ben-Awuah, S Kalantari, Y Pourrahimian, H Askari-Nasab International Journal of Mining and Mineral Engineering 2 (2), 137-158, 2010 | 21 | 2010 |
A framework for open-pit mine production scheduling under semi-mobile in-pit crushing and conveying systems with the high-angle conveyor D Liu, Y Pourrahimian Mining 1 (1), 59-79, 2021 | 19 | 2021 |
An application of rock engineering system for assessment of the rock mass fragmentation: a hybrid approach and case study A Azadmehr, SME Jalali, Y Pourrahimian Rock Mechanics and Rock Engineering 52 (11), 4403-4419, 2019 | 19 | 2019 |
Conditional draw rate control system in block-cave production scheduling using mathematical programming F Nezhadshahmohammad, H Aghababaei, Y Pourrahimian International Journal of Mining, Reclamation and Environment, 2017 | 19 | 2017 |
Determination of development precedence for drawpoints in block-cave mining F Khodayari, Y Pourrahimian 5th International Symposium Mineral Resources and Mine Development (AIMS …, 2015 | 19 | 2015 |