Follow
Yashar Pourrahimian
Yashar Pourrahimian
Associate Professor
Verified email at ualberta.ca - Homepage
Title
Cited by
Cited by
Year
Mixed integer linear programming formulations for open pit production scheduling
H Askari-Nasab, Y Pourrahimian, E Ben-Awuah, S Kalantari
Journal of Mining Science 47, 338-359, 2011
1402011
Modified Kuz—Ram fragmentation model and its use at the Sungun Copper Mine
S Gheibie, H Aghababaei, SH Hoseinie, Y Pourrahimian
International Journal of Rock Mechanics and Mining Sciences 46 (6), 967-973, 2009
1382009
Strategic mining options optimization: Open pit mining, underground mining or both
E Ben-Awuah, O Richter, T Elkington, Y Pourrahimian
International Journal of Mining Science and Technology 26 (6), 1065-1071, 2016
1312016
Development of a new classification system for assessing of rock mass drillability index (RDi)
SH Hoseinie, H Aghababaei, Y Pourrahimian
International Journal of Rock Mechanics and Mining Sciences 45 (1), 1-10, 2008
1232008
A multi-step approach for block-cave production scheduling optimization
P Yashar, AN Hooman
International Journal of Mining Science and Technology 23 (5), 739-750, 2013
712013
Comparison of chemical suppressants under different atmospheric temperatures for the control of fugitive dust emission on mine hauls roads
D Omane, WV Liu, Y Pourrahimian
Atmospheric Pollution Research 9 (3), 561-568, 2018
562018
A systematic review of artificial intelligence and data-driven approaches in strategic open-pit mine planning
R Noriega, Y Pourrahimian
Resources Policy 77, 102727, 2022
452022
Mathematical programming applications in block-caving scheduling: a review of models and algorithms
F Khodayari, Y Pourrahimian
Int. J. Mining and Mineral Engineering 6 (3), 234-257, 2015
442015
Mixed–Integer Linear Programming formulation for block–cave sequence optimisation
Y Pourrahimian, H Askari–Nasab, D Tannant
International Journal of Mining and Mineral Engineering 4 (1), 26-49, 2012
402012
Mathematical programming for sequence optimization in block cave mining
Y Pourrahimian
University of Alberta (Canada), 2013
392013
A 3D approximate hybrid algorithm for stope boundary optimization
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian
Computers & Operations Research 115, 104475, 2020
362020
Effects of fibers on expansive shotcrete mixtures consisting of calcium sulfoaluminate cement, ordinary Portland cement, and calcium sulfate
H Yu, L Wu, WV Liu, Y Pourrahimian
Journal of rock mechanics and geotechnical engineering 10 (2), 212-221, 2018
352018
Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying
M Shamsi, Y Pourrahimian, M Rahmanpour
International Journal of Mining, Reclamation and Environment 36 (2), 142-158, 2022
242022
An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation
Y Pourrahimian, H Askari-Nasab
Mining Technology 123 (3), 162-172, 2014
232014
A framework for open-pit mine production scheduling under semi-mobile in-pit crushing and conveying systems with the high-angle conveyor
D Liu, Y Pourrahimian
Mining 1 (1), 59-79, 2021
212021
Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling
F Nezhadshahmohammad, Y Pourrahimian, H Aghababaei
International Journal of Mining Science and Technology 28 (6), 941-950, 2018
212018
Hierarchical mine production scheduling using discrete-event simulation
E Ben-Awuah, S Kalantari, Y Pourrahimian, H Askari-Nasab
International Journal of Mining and Mineral Engineering 2 (2), 137-158, 2010
212010
Stope boundary optimization: A mathematical model and efficient heuristics
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian, SA MirHassani
Resources Policy 62, 515-526, 2019
202019
An application of rock engineering system for assessment of the rock mass fragmentation: a hybrid approach and case study
A Azadmehr, SME Jalali, Y Pourrahimian
Rock Mechanics and Rock Engineering 52 (11), 4403-4419, 2019
192019
Conditional draw rate control system in block-cave production scheduling using mathematical programming
F Nezhadshahmohammad, H Aghababaei, Y  Pourrahimian
International Journal of Mining, Reclamation and Environment, 2017
192017
The system can't perform the operation now. Try again later.
Articles 1–20