Flavio Tonelli
Title
Cited by
Cited by
Year
Performance measurement and management: a literature review and a research agenda
P Taticchi, F Tonelli, L Cagnazzo
Measuring business excellence, 2010
5642010
Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops
AAG Bruzzone, D Anghinolfi, M Paolucci, F Tonelli
CIRP annals 61 (1), 459-462, 2012
3092012
Performance measurement of sustainable supply chains: A literature review and a research agenda
P Taticchi, F Tonelli, R Pasqualino
International Journal of Productivity and Performance Management, 2013
2412013
A review of decision-support tools and performance measurement and sustainable supply chain management
P Taticchi, P Garengo, SS Nudurupati, F Tonelli, R Pasqualino
International Journal of Production Research 53 (21), 6473-6494, 2015
2072015
Performance measurement and management systems: state of the art, guidelines for design and challenges
P Taticchi, K Balachandran, F Tonelli
Measuring Business Excellence, 2012
1242012
Industrial sustainability: challenges, perspectives, actions
F Tonelli, S Evans, P Taticchi
International Journal of Business Innovation and Research 7 (2), 143-163, 2013
1192013
Augmented and virtual reality applications in industrial systems: A qualitative review towards the industry 4.0 era
L Damiani, M Demartini, G Guizzi, R Revetria, F Tonelli
IFAC-PapersOnLine 51 (11), 624-630, 2018
772018
A Novel Methodology for Manufacturing Firms Value Modeling and Mapping to Improve Operational Performance in the Industry 4.0 era
F Tonelli, M Demartini, A Loleo, C Testa
Conference: 49th CIRP Conference on Manufacturing Systems, At Stuttgart …, 2016
702016
Min-max and predictive control for the management of distribution in supply chains
A Alessandri, M Gaggero, F Tonelli
IEEE Transactions on Control Systems Technology 19 (5), 1075-1089, 2010
642010
Influencing factors of successful transitions towards product-service systems: a simulation approach
NP Bianchi, S Evans, R Revetria, F Tonelli
International Journal of Mathematics and Computers in Simulation 3 (1), 30-43, 2009
542009
A decomposition and hierarchical approach for business performance measurement and management
P Taticchi, F Tonelli, L Cagnazzo
Measuring Business Excellence, 2009
472009
Warehouse layout design: minimizing travel time with a genetic and simulative approach-methodology and case study
F Queirolo, M Schenone, P Nan, F Tonelli
Proceedings 14 th European Simulation Symposium. SCS Europe BVBA, 2002
322002
Investigating flexibility as a performance dimension of a Manufacturing Value Modeling Methodology (MVMM): a framework for identifying flexibility types in manufacturing systems
N Burger, M Demartini, F Tonelli, F Bodendorf, C Testa
Procedia CIRP 63, 33-38, 2017
292017
Food industry digitalization: from challenges and trends to opportunities and solutions
M Demartini, C Pinna, F Tonelli, S Terzi, C Sansone, C Testa
IFAC-PapersOnLine 51 (11), 1371-1378, 2018
282018
Facing energy-aware scheduling: a multi-objective extension of a scheduling support system for improving energy efficiency in a moulding industry
M Paolucci, D Anghinolfi, F Tonelli
Soft Computing, 1-12, 2016
252016
A framework for assessment and implementation of product-service systems strategies: learning from an action research in the health-care sector
F Tonelli, P Taticchi, E Starnini Sue
WSEAS Transaction on Business and Economics 6 (7), 303-319, 2009
252009
Soft drink supply chain sustainability: A case based approach to identify and explain best practices and key performance indicators
M Demartini, C Pinna, B Aliakbarian, F Tonelli, S Terzi
Sustainability 10 (10), 3540, 2018
232018
Multi-manned assembly line balancing problem with skilled workers: a new mathematical formulation
D Giglio, M Paolucci, A Roshani, F Tonelli
IFAC-PapersOnLine 50 (1), 1211-1216, 2017
232017
Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach
F Tonelli, M Paolucci, D Anghinolfi, P Taticchi
Production Planning & Control 24 (1), 110-127, 2013
232013
Assessment of mathematical programming and agent-based modelling for off-line scheduling: Application to energy aware manufacturing
F Tonelli, AAG Bruzzone, M Paolucci, E Carpanzano, G Nicolò, A Giret, ...
CIRP Annals 65 (1), 405-408, 2016
222016
The system can't perform the operation now. Try again later.
Articles 1–20