Yong Kwon Cho
TitleCited byYear
Automatic BIM component extraction from point clouds of existing buildings for sustainability applications
C Wang, YK Cho, C Kim
Automation in Construction 56, 1-13, 2015
1122015
Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
YK Cho, JH Youn, D Martinez
Automation in Construction 19 (1), 43-54, 2010
932010
A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects
YS Kim, SW Oh, YK Cho, JW Seo
Automation in Construction 17 (2), 163-179, 2008
852008
Framework of automated construction-safety monitoring using cloud-enabled BIM and BLE mobile tracking sensors
JW Park, K Kim, YK Cho
Journal of Construction Engineering and Management 143 (2), 05016019, 2016
672016
Case study of BIM and cloud–enabled real-time RFID indoor localization for construction management applications
Y Fang, YK Cho, S Zhang, E Perez
Journal of Construction Engineering and Management 142 (7), 05016003, 2016
672016
A framework for rapid local area modeling for construction automation
YK Cho, CT Haas, K Liapi, SV Sreenivasan
Automation in Construction 11 (6), 629-641, 2002
662002
Smart scanning and near real-time 3D surface modeling of dynamic construction equipment from a point cloud
C Wang, YK Cho
Automation in Construction 49, 239-249, 2015
602015
As-is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system
C Wang, YK Cho, M Gai
Journal of Computing in Civil Engineering 27 (6), 645-656, 2012
582012
Performance Test of Wireless Technologies for Personnel and Equipment Proximity Sensing in Work Zones
WS JW Park, E Marks, YK Cho
Journal of Construction Engineering and Management, 2015
572015
Projection-Recognition-Projection (PRP) Method for Rapid Object Recognition and Registration from a 3D Point Cloud
M Gai, Y Cho, C Wang
International Workshop on Computing in Civil Engineering (2012), 325-332, 2012
57*2012
Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM
K Kim, Y Cho, S Zhang
Automation in Construction 70, 128-142, 2016
542016
Framework for work-space planning using four-dimensional BIM in construction projects
B Choi, HS Lee, M Park, YK Cho, H Kim
Journal of Construction Engineering and Management 140 (9), 04014041, 2014
542014
A framework for virtual interactive construction education (VICE)
J Goedert, Y Cho, M Subramaniam, H Guo, L Xiao
Automation in Construction 20 (1), 76-87, 2011
502011
Visualization, Information Modeling, and Simulation: Grand Challenges in the Construction Industry
F Leite, Y Cho, A Behzadan, S Lee, S Choe, Y Fang, R Akhavian, ...
Journal of Computing in Civil Engineering, 2016
432016
Monitoring of construction performance using daily progress photograph logs and 4D as-planned models
M Golparvar-Fard, F Peña-Mora, S Savarese
Computing in Civil Engineering (2009), 53-63, 2009
41*2009
3D as-is building energy modeling and diagnostics: A review of the state-of-the-art
YK Cho, Y Ham, M Golpavar-Fard
Advanced Engineering Informatics 29 (2), 184-195, 2015
402015
BIM-integrated sustainable material and renewable energy simulation
YK Cho, S Alaskar, TA Bode
Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010
372010
A framework for real-time pro-active safety assistance for mobile crane lifting operations
Y Fang, YK Cho, J Chen
Automation in Construction 72, 367-379, 2016
362016
Learning opportunities and career implications of experience with BIM/VDC
D Russell, YK Cho, E Cylwik
Practice Periodical on Structural Design and Construction 19 (1), 111-121, 2013
352013
Target-focused local workspace modeling for construction automation applications
YK Cho, C Wang, P Tang, CT Haas
Journal of Computing in Civil Engineering 26 (5), 661-670, 2011
352011
The system can't perform the operation now. Try again later.
Articles 1–20