Follow
Hosein Taghaddos
Hosein Taghaddos
Associate Professor, School of Civil Engineering, College of Engineering, University of Tehran
Verified email at ut.ac.ir - Homepage
Title
Cited by
Cited by
Year
Prediction of long-term chloride diffusion in silica fume concrete in a marine environment
A Farahani, H Taghaddos, M Shekarchi
Cement and Concrete Composites 59, 10-17, 2015
1572015
Simulation-based multiagent approach for scheduling modular construction
H Taghaddos, U Hermann, S AbouRizk, Y Mohamed
J. Comput. Civ. Eng 28 (2), 263-274, 2014
922014
A methodology for mobile crane lift path checking in heavy industrial projects
Z Lei, H Taghaddos, U Hermann, M Al-Hussein
Automation in Construction 31, 41-53, 2013
912013
Automated crane planning and optimization for modular construction
H Taghaddos, U Hermann, AB Abbasi
Automation in construction 95, 219-232, 2018
632018
Automated method for checking crane paths for heavy lifts in industrial projects
Z Lei, H Taghaddos, J Olearczyk, M Al-Hussein, U Hermann
Journal of construction engineering and management 139 (10), 04013011, 2013
572013
Simulation-based auction protocol for resource scheduling problems
H Taghaddos, S AbouRizk, Y Mohamed, U Hermann
Journal of construction engineering and management 138 (1), 31-42, 2012
402012
Algorithm for mobile crane walking path planning in congested industrial plants
Z Lei, SH Han, A Boufergučne, H Taghaddos, U Hermann, M Al-Hussein
Journal of Construction Engineering and Management 141 (2), 05014016, 2015
382015
From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies
Z Lei, H Taghaddos, SH Han, A Boufergučne, M Al-Hussein, U Hermann
Canadian Journal of Civil Engineering 42 (3), 190-198, 2015
302015
Auction-based simulation for industrial crane operations
H Taghaddos, A Eslami, U Hermann, S AbouRizk, Y Mohamed
Automation in Construction 104, 107-119, 2019
282019
Integrated simulation-based scheduling for module assembly yard
H Taghaddos, S AbouRizk, Y Mohamed, R Hermann
Construction Research Congress 2009: Building a Sustainable Future, 1270-1279, 2009
282009
Simulation-based multiple heavy lift planning in industrial construction
H Taghaddos, S AbouRizk, Y Mohamed, U Hermann
Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010
252010
Evaluating industrial modularization strategies: Local vs. overseas fabrication
AN Tak, H Taghaddos, A Mousaei, UR Hermann
Automation in Construction 114, 103175, 2020
232020
Prediction of compressive strength behaviour in RPC with applying an adaptive network-based fuzzy interface system
H Taghaddos, F Mahmoudzadeh, A Pourmoghaddam, M Shekarchizadeh
Proceedings of the International Symposium on Ultra High Performance …, 2004
232004
Utilization of virtual reality visualizations on heavy mobile crane planning for modular construction
N Kayhani, H Taghaddos, M Noghabaee
arXiv preprint arXiv:1901.06248, 2019
212019
Distributed agent-based simulation of construction projects with HLA
H Taghaddos, SM AbouRizk, Y Mohamed, I Ourdev
2008 Winter Simulation Conference, 2413-2420, 2008
192008
Integrating discrete event simulation and genetic algorithm optimization for bridge maintenance planning
MH Nili, H Taghaddos, B Zahraie
Automation in Construction 122, 103513, 2021
182021
Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
N Kayhani, H Taghaddos, A Mousaei, S Behzadipour, U Hermann
Automation in Construction 122, 103508, 2021
182021
The influence of craft workers’ educational attainment and experience level in fatal injuries prevention in construction projects
H Karimi, H Taghaddos
Safety science 117, 417-427, 2019
182019
Automation of construction quantity take-off: using Building Information Modeling (BIM)
H Taghaddos, A Mashayekhi, B Sherafat
arXiv preprint arXiv:1906.02400, 2019
182019
An A-Star algorithm for semi-optimization of crane location and configuration in modular construction
SM Bagheri, H Taghaddos, A Mousaei, F Shahnavaz, U Hermann
Automation in Construction 121, 103447, 2021
172021
The system can't perform the operation now. Try again later.
Articles 1–20